  "reviewedAt": "2026-10-01",
  "timezone": "Australia/Sydney",
  "projectDossierCount": 11,
  "projectsWithSitePhotos": 10,
  "publishedPhotoCount": 82,
  "professionalOriginalReportCount": 13,
  "projects": [
    {
      "project": "1 Toolang Road",
      "address": "1 Toolang Road, St Ives, NSW 2075, Australia",
      "pages": {
        "en": "https://audbuild.com/projects/construction/1-toolang-road-st-ives/",
        "zh": "https://audbuild.com/zh/projects/construction/1-toolang-road-st-ives/"
      },
      "stage": {
        "en": "Skylight frame checks and plastering activities",
        "zh": "天窗框架检查与抹灰工序"
      },
      "recordReviewDate": "2026-10-01",
      "builderMasterReviewedAt": "2026-09-30",
      "builderAsRecorded": "AUSTRALIAN URBAN DIRECT IBUYING PTY",
      "photos": [
        {
          "url": "/assets/construction-progress/1-toolang-road-st-ives/01-2026-09-30.webp",
          "date": "2026-09-30",
          "width": 1200,
          "height": 1600,
          "altZh": "天窗开口与屋面框架 · 1 Toolang Road · 2026-09-30",
          "altEn": "Skylight opening and roof framing at 1 Toolang Road · 2026-09-30",
          "originalSha256": "7b4fbe8c74090d6a5a5dc1cbea3d6d28425b110ad886a8488e5e31f51aae8bb3",
          "publicSha256": "777cdf1c5ea5437714d1850c69ce0b4cd8a1810eecbeacacabe1bb327905d4f6"
        },
        {
          "url": "/assets/construction-progress/1-toolang-road-st-ives/02-2026-09-30.webp",
          "date": "2026-09-30",
          "width": 1200,
          "height": 1600,
          "altZh": "天窗开口周围木框架 · 1 Toolang Road · 2026-09-30",
          "altEn": "Timber framing around the skylight opening at 1 Toolang Road · 2026-09-30",
          "originalSha256": "e059ac713e1873d70f8caa1d619ed25def7c6d18ae07d57a48835b592fcd50c1",
          "publicSha256": "d46a786d330efd33423c881086b4a6f61299c3bc82fe641bd7c6483a1739d206"
        },
        {
          "url": "/assets/construction-progress/1-toolang-road-st-ives/03-2026-09-30.webp",
          "date": "2026-09-30",
          "width": 1200,
          "height": 1600,
          "altZh": "室内看向天窗的屋面构件 · 1 Toolang Road · 2026-09-30",
          "altEn": "Roof components seen through the skylight opening at 1 Toolang Road · 2026-09-30",
          "originalSha256": "a1291962597c398db2b9abdacec7da1a79e05ba581ea3f846a55a7609b8d1c93",
          "publicSha256": "57dec96777273519e5822a97aeb85056f8aee12a04cb34f4a4309596e9d7b073"
        },
        {
          "url": "/assets/construction-progress/1-toolang-road-st-ives/04-2026-09-28.webp",
          "date": "2026-09-28",
          "width": 1200,
          "height": 1600,
          "altZh": "外墙脚手架与堆放材料 · 1 Toolang Road · 2026-09-28",
          "altEn": "Exterior scaffolding and stored materials at 1 Toolang Road · 2026-09-28",
          "originalSha256": "3f5b0dd4ea171d5309cb008638194c88b48de981f508175056ff6ea481d358bc",
          "publicSha256": "1b7702ad75f4c9603dc1c0061ac21893a9115e402f0de16a1232ee3a52266454"
        },
        {
          "url": "/assets/construction-progress/1-toolang-road-st-ives/05-2026-09-28.webp",
          "date": "2026-09-28",
          "width": 1200,
          "height": 1600,
          "altZh": "室内顶面与施工脚手架 · 1 Toolang Road · 2026-09-28",
          "altEn": "Interior ceiling and work scaffolding at 1 Toolang Road · 2026-09-28",
          "originalSha256": "aaf72e7089f7aed17f9bfc1e091c8bbeaee218645897f1ea8bf8131eb16822f4",
          "publicSha256": "e67163bdf2cfb814cf48a76761fc20796086b6009c78a99aea94f9c4ab44c9e7"
        },
        {
          "url": "/assets/construction-progress/1-toolang-road-st-ives/06-2026-09-28.webp",
          "date": "2026-09-28",
          "width": 1200,
          "height": 1600,
          "altZh": "建筑侧墙与脚手架 · 1 Toolang Road · 2026-09-28",
          "altEn": "Side wall and scaffolding at 1 Toolang Road · 2026-09-28",
          "originalSha256": "cbb85bf597e3426dbad4fe17e230b85fbe8878aeca7f100089797146418f3fe3",
          "publicSha256": "e38584eca9fd2eb58b413b8517a72215e0c1b62df1f6435c4468abd49d794b77"
        },
        {
          "url": "/assets/construction-progress/1-toolang-road-st-ives/07-2026-09-26.webp",
          "date": "2026-09-26",
          "width": 1200,
          "height": 1600,
          "altZh": "住宅外立面与施工材料 · 1 Toolang Road · 2026-09-26",
          "altEn": "House exterior and construction materials at 1 Toolang Road · 2026-09-26",
          "originalSha256": "3d0070eee2c7eeeae06d8bb7d3265220e72fe638f528e051d1bdce33d7f8f87d",
          "publicSha256": "08f80391e75a9e5170e02a390872fe8187f52352b2f979ce6055e75678a4ac71"
        },
        {
          "url": "/assets/construction-progress/1-toolang-road-st-ives/08-2026-09-26.webp",
          "date": "2026-09-26",
          "width": 1200,
          "height": 1600,
          "altZh": "室内砌体洞口与材料 · 1 Toolang Road · 2026-09-26",
          "altEn": "Interior masonry opening and materials at 1 Toolang Road · 2026-09-26",
          "originalSha256": "fd638b71c5ab92683855b51247addde4146d38e9f66ee569f2826a0aa706f8f9",
          "publicSha256": "b2ec0e6a296567d6a4bf9c04793fbd9cba0b20033ec01b7d498cb62cf3c20ac6"
        }
      ],
      "originalReports": [
        {
          "id": "IR08",
          "number": "SVR26021.05A",
          "inspectionDate": "2026-05-08",
          "issuer": "QDE Engineering Pty Ltd",
          "scope": "DINCEL WALL AND CONCRETE COLUMN",
          "pages": 4,
          "sha256": "4d34e4bfb98e37032d24b655dbf800601b34c42218a08a395f9491a68f9cdb61",
          "publicAccess": "index_and_summary_only"
        },
        {
          "id": "IR09",
          "number": "SVR26021.05A",
          "inspectionDate": "2026-05-14",
          "issuer": "QDE Engineering Pty Ltd",
          "scope": "First Floor Slab",
          "pages": 4,
          "sha256": "5880cd134c049d60999048fa25b42bb373b385e23deaad1168eb9f8c82afa6bc",
          "publicAccess": "index_and_summary_only"
        },
        {
          "id": "IR10",
          "number": "SVR26021.06A",
          "inspectionDate": "2026-06-05",
          "issuer": "QDE Engineering Pty Ltd",
          "scope": "FIRST FLOOR DINCEL WALL",
          "pages": 3,
          "sha256": "e52f0df94e3bdf83f7bfa9c83679662e18c4aa60f7604f65ce2d607281c2d955",
          "publicAccess": "index_and_summary_only"
        }
      ],
      "pmTaskSnapshot": {
        "readOn": "2026-10-01",
        "scope": "Stored PM task rows, often older imports; planned dates, recorded status and actual-finish fields do not constitute inspection or current field verification. Read with the newer dated daily records.",
        "tasks": [
          {
            "name": "房屋拆除",
            "status": "已完成",
            "startDate": "2025-08-31",
            "finishDate": "2025-09-22",
            "actualFinishDate": "2025-09-22",
            "aiTableSyncedAt": "2026-09-02T02:50:10.872Z"
          },
          {
            "name": "施工准备与土方开挖",
            "status": "已完成",
            "startDate": "2025-09-23",
            "finishDate": "2025-10-16",
            "actualFinishDate": "2025-10-16",
            "aiTableSyncedAt": "2026-09-02T02:50:10.872Z"
          },
          {
            "name": "地下室框架",
            "status": "逾期完成",
            "startDate": "2025-10-21",
            "finishDate": "2025-12-09",
            "actualFinishDate": "2025-12-22",
            "aiTableSyncedAt": "2026-09-02T02:50:10.872Z"
          },
          {
            "name": "一楼拓展楼板浇水泥",
            "status": "逾期完成",
            "startDate": "2026-01-11",
            "finishDate": "2026-03-02",
            "actualFinishDate": "2026-03-17",
            "aiTableSyncedAt": "2026-09-02T02:50:10.872Z"
          },
          {
            "name": "游泳池",
            "status": "已完成",
            "startDate": "2026-01-22",
            "finishDate": "2026-01-29",
            "actualFinishDate": "2026-01-29",
            "aiTableSyncedAt": "2026-09-02T02:50:10.872Z"
          },
          {
            "name": "一楼楼板砌砖",
            "status": "已完成",
            "startDate": "2026-03-25",
            "finishDate": "2026-04-03",
            "actualFinishDate": "2026-04-01",
            "aiTableSyncedAt": "2026-09-02T02:50:10.872Z"
          },
          {
            "name": "二楼楼面模板钢筋浇水泥",
            "status": "逾期完成",
            "startDate": "2026-04-02",
            "finishDate": "2026-04-24",
            "actualFinishDate": "2026-05-17",
            "aiTableSyncedAt": "2026-09-02T02:50:10.872Z"
          },
          {
            "name": "脚手架搭设",
            "status": "逾期完成",
            "startDate": "2026-04-05",
            "finishDate": "2026-04-07",
            "actualFinishDate": "2026-04-29",
            "aiTableSyncedAt": "2026-09-02T02:50:10.872Z"
          },
          {
            "name": "二楼木架（水泥强度养护）",
            "status": "已完成",
            "startDate": "2026-05-26",
            "finishDate": "2026-06-08",
            "actualFinishDate": "2026-05-31",
            "aiTableSyncedAt": "2026-09-02T02:50:10.872Z"
          },
          {
            "name": "二楼砌砖+dincel水泥墙体",
            "status": "已完成",
            "startDate": "2026-05-31",
            "finishDate": "2026-06-15",
            "actualFinishDate": "2026-06-15",
            "aiTableSyncedAt": "2026-09-02T02:50:10.872Z"
          },
          {
            "name": "屋顶",
            "status": "逾期完成",
            "startDate": "2026-06-16",
            "finishDate": "2026-06-22",
            "actualFinishDate": "2026-06-25",
            "aiTableSyncedAt": "2026-09-02T02:50:10.872Z"
          },
          {
            "name": "门窗安装",
            "status": "逾期完成",
            "startDate": "2026-07-12",
            "finishDate": "2026-08-02",
            "actualFinishDate": "2026-08-05",
            "aiTableSyncedAt": "2026-09-02T02:50:10.872Z"
          },
          {
            "name": "水电、煤气、空调管线施工",
            "status": "逾期完成",
            "startDate": "2026-07-22",
            "finishDate": "2026-08-08",
            "actualFinishDate": "2026-08-24",
            "aiTableSyncedAt": "2026-09-02T02:50:10.872Z"
          },
          {
            "name": "Render wall",
            "status": "进行中",
            "startDate": "2026-08-04",
            "finishDate": "2026-09-17",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-09-02T02:50:10.872Z"
          },
          {
            "name": "木架和蓝板施工",
            "status": "已完成",
            "startDate": "2026-08-04",
            "finishDate": "2026-08-23",
            "actualFinishDate": "2026-08-23",
            "aiTableSyncedAt": "2026-09-02T02:50:10.872Z"
          },
          {
            "name": "gyprock(天花、墙、抹灰及修饰）",
            "status": "进行中",
            "startDate": "2026-08-12",
            "finishDate": "2026-09-14",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-09-02T02:50:10.872Z"
          },
          {
            "name": "室内乳胶漆",
            "status": "未开始",
            "startDate": "2026-10-06",
            "finishDate": "2026-10-26",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-09-02T02:50:10.872Z"
          },
          {
            "name": "室内防水及瓷砖",
            "status": "未开始",
            "startDate": "2026-10-08",
            "finishDate": "2026-11-22",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-09-02T02:50:10.872Z"
          },
          {
            "name": "外立面装饰安装",
            "status": "未开始",
            "startDate": "2026-10-14",
            "finishDate": "2026-10-17",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-09-02T02:50:10.872Z"
          },
          {
            "name": "Remove Scaffolding 拆手脚架",
            "status": "未开始",
            "startDate": "2026-10-19",
            "finishDate": "2026-10-19",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-09-02T02:50:10.872Z"
          },
          {
            "name": "室内地板",
            "status": "未开始",
            "startDate": "2026-10-27",
            "finishDate": "2026-11-12",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-09-02T02:50:10.872Z"
          },
          {
            "name": "楼梯/阳台拦杆、扶手",
            "status": "未开始",
            "startDate": "2026-11-02",
            "finishDate": "2026-11-12",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-09-02T02:50:10.872Z"
          },
          {
            "name": "柜体、卫浴、灯具安装",
            "status": "未开始",
            "startDate": "2026-11-04",
            "finishDate": "2026-12-19",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-09-02T02:50:10.872Z"
          },
          {
            "name": "室外园林（园建、绿化）",
            "status": "未开始",
            "startDate": "2026-11-20",
            "finishDate": "2026-12-12",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-09-02T02:50:10.872Z"
          },
          {
            "name": "OC验收",
            "status": "未开始",
            "startDate": "2026-12-21",
            "finishDate": "2027-01-05",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-09-02T02:50:10.872Z"
          },
          {
            "name": "OC以外场地装修",
            "status": "未开始",
            "startDate": "2027-01-06",
            "finishDate": "2027-02-22",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-09-02T02:50:10.872Z"
          }
        ]
      },
      "latestDailyRecordSummary": [
        {
          "date": "2026-10-01",
          "zh": "材料到场并制作一个天窗框架；日报称因当日问题，其余留待次日。",
          "en": "Materials and one skylight frame made; the record says the remaining frames were deferred until the next day due to issues."
        },
        {
          "date": "2026-09-30",
          "zh": "日报记录天窗框架检查。",
          "en": "The daily record reports a skylight-frame check."
        }
      ]
    },
    {
      "project": "10 College Crescent",
      "address": "10 College Crescent, St Ives, NSW 2075, Australia",
      "pages": {
        "en": "https://audbuild.com/projects/construction/10-college-crescent-st-ives/",
        "zh": "https://audbuild.com/zh/projects/construction/10-college-crescent-st-ives/"
      },
      "stage": {
        "en": "Masonry, carpentry and site coordination",
        "zh": "砌体、木工与现场协调"
      },
      "recordReviewDate": "2026-10-01",
      "builderMasterReviewedAt": "2026-09-30",
      "builderAsRecorded": "AUSTRALIAN URBAN DIRECT IBUYING PTY",
      "photos": [
        {
          "url": "/assets/construction-progress/10-college-crescent-st-ives/01-2026-09-30.webp",
          "date": "2026-09-30",
          "width": 1200,
          "height": 1600,
          "altZh": "砖墙内部与待安装门窗构件 · 10 College Crescent · 2026-09-30",
          "altEn": "Interior brick walls and stored window or door components at 10 College Crescent · 2026-09-30",
          "originalSha256": "8c81296299fb7e52ca526b111cda09ae1e079ba143162eaa2fb50329fa94ebfd",
          "publicSha256": "4d94a29f39437785692fdbd8da8b14cde0f5919090beb4c27c352d93fc2ade48"
        },
        {
          "url": "/assets/construction-progress/10-college-crescent-st-ives/02-2026-09-30.webp",
          "date": "2026-09-30",
          "width": 1200,
          "height": 1600,
          "altZh": "住宅外墙、脚手架与施工材料 · 10 College Crescent · 2026-09-30",
          "altEn": "Exterior scaffolding and construction materials at 10 College Crescent · 2026-09-30",
          "originalSha256": "6adf611e7b4e7478874fafdb4b2c13d9b25c078b215b82815c040cae4a2c2aae",
          "publicSha256": "fe84dc00e2ccdfef96c84c176807abb61622c7fb060485cfc15710e23c14738b"
        },
        {
          "url": "/assets/construction-progress/10-college-crescent-st-ives/03-2026-09-30.webp",
          "date": "2026-09-30",
          "width": 1200,
          "height": 1600,
          "altZh": "砌体内墙与窗洞口 · 10 College Crescent · 2026-09-30",
          "altEn": "Interior masonry and window opening at 10 College Crescent · 2026-09-30",
          "originalSha256": "9436c14a35f1f633305b76c2fb46a0d21aac0b3d518c673352a98184c8b746c5",
          "publicSha256": "d0b073f5d40bb1f53d71a5816e88e34427194faec8d67622997cad288f7c6326"
        },
        {
          "url": "/assets/construction-progress/10-college-crescent-st-ives/04-2026-09-29.webp",
          "date": "2026-09-29",
          "width": 1200,
          "height": 1600,
          "altZh": "脚手架旁的施工车辆与材料 · 10 College Crescent · 2026-09-29",
          "altEn": "Site vehicle beside scaffolding and materials at 10 College Crescent · 2026-09-29",
          "originalSha256": "4a7628693c42affc2ce85a897fa029c5b8013869fe807a6b0020bfaec4ec9b7e",
          "publicSha256": "a621f2024c6bd739345abecb424e3d3ca14b08b83b1403cf1d33db509aef0365"
        },
        {
          "url": "/assets/construction-progress/10-college-crescent-st-ives/05-2026-09-30.webp",
          "date": "2026-09-30",
          "width": 1200,
          "height": 1600,
          "altZh": "地下室外部脚手架和开口 · 10 College Crescent · 2026-09-30",
          "altEn": "Scaffolding around the basement opening at 10 College Crescent · 2026-09-30",
          "originalSha256": "b86a60fe7d81d2c0c073e244dba3b9404e37bdf8b576bd310cb4c922a4ae250f",
          "publicSha256": "568ea2267fb34c90c161d0922ef8942c774062645283a612e5669a909bcb7b97"
        },
        {
          "url": "/assets/construction-progress/10-college-crescent-st-ives/06-2026-09-30.webp",
          "date": "2026-09-30",
          "width": 1200,
          "height": 1600,
          "altZh": "木框架与天窗施工区域 · 10 College Crescent · 2026-09-30",
          "altEn": "Timber framing at a skylight work area at 10 College Crescent · 2026-09-30",
          "originalSha256": "90b5bcb2b49255092f46941308bfd9f48cf7805c3a43a6ac72f59fe04f1770d9",
          "publicSha256": "5348422ef9b68b5558d3bc3762b8179cecd3c2199f16820a744ba25092f47a01"
        },
        {
          "url": "/assets/construction-progress/10-college-crescent-st-ives/07-2026-09-30.webp",
          "date": "2026-09-30",
          "width": 1200,
          "height": 1600,
          "altZh": "住宅前方土方与材料 · 10 College Crescent · 2026-09-30",
          "altEn": "Earthworks and materials in front of the house at 10 College Crescent · 2026-09-30",
          "originalSha256": "515ba7acec75ebf9bd3d16c13d18a6604a17aae6ae33908861ed48f97768c279",
          "publicSha256": "2ee39532b5f0556ad7c3c2a9623ad7228b3a9ce944376584313fab4cbe9dfba3"
        },
        {
          "url": "/assets/construction-progress/10-college-crescent-st-ives/08-2026-09-30.webp",
          "date": "2026-09-30",
          "width": 1200,
          "height": 1600,
          "altZh": "住宅外墙、砖墙和脚手架 · 10 College Crescent · 2026-09-30",
          "altEn": "Brick exterior and scaffolding at 10 College Crescent · 2026-09-30",
          "originalSha256": "13e6a5683c06e1ec8f3680dad4dd8dbdaa78381950e2d4dcfdb58dcb67c39535",
          "publicSha256": "32686f026d9b99d97fde9f2fd5c189186bb110e2eff8d25b8a5128f73e95cda5"
        },
        {
          "url": "/assets/construction-progress/10-college-crescent-st-ives/09-2026-10-01.webp",
          "date": "2026-10-01",
          "width": 1200,
          "height": 1600,
          "altZh": "10 College Crescent 屋面工人与金属屋面板 · 2026-10-01",
          "altEn": "Metal roof sheets and workers at 10 College Crescent, St Ives · 2026-10-01",
          "originalSha256": "cf495f16e97e30299ebb79757afa0a069d06132e45749ad9e9b3c5ea98022a4c",
          "publicSha256": "b378414d66e85d9dd6bbf40016110c71c7478acc15a03a2a4bd96ac92a09657e"
        },
        {
          "url": "/assets/construction-progress/10-college-crescent-st-ives/10-2026-10-01.webp",
          "date": "2026-10-01",
          "width": 1200,
          "height": 1600,
          "altZh": "10 College Crescent 部分金属屋面及未封闭框架 · 2026-10-01",
          "altEn": "Partially covered metal roof and open framing at 10 College Crescent, St Ives · 2026-10-01",
          "originalSha256": "d0ca2dba8997692c7b0b98e0870a601be02c7c16a4aeddde519361cafdd7a1d7",
          "publicSha256": "7ef295a86a788212ef5f6783e8a113350430843b2d7f52ac88d06aa10d061fdf"
        }
      ],
      "originalReports": [
        {
          "id": "IR01",
          "number": "CDC 12425/01",
          "inspectionDate": "2026-07-21",
          "issuer": "Exclusive Certifiers Pty Ltd",
          "scope": "First floor slab / Footings and Slabs",
          "pages": 1,
          "sha256": "29548d1cad0b32526a0ce5eca32932c15e2c4c7b6fc99805dc3b72aa86e44da0",
          "publicAccess": "index_and_summary_only"
        },
        {
          "id": "IR06",
          "number": "SVR26013.04A",
          "inspectionDate": "2026-04-30",
          "issuer": "QDE Engineering Pty Ltd",
          "scope": "SLAB ON EXTENDING GROUND FLOOR",
          "pages": 3,
          "sha256": "ea57d1a6f92bdc8746281aa9092557796497341d34c232bca8daf2310d46588c",
          "publicAccess": "index_and_summary_only"
        },
        {
          "id": "IR07",
          "number": "SVR26013.05A",
          "inspectionDate": "2026-05-08",
          "issuer": "QDE Engineering Pty Ltd",
          "scope": "DINCEL WALL",
          "pages": 3,
          "sha256": "980a42480734fb9cdf0f53e664cbe7486b4768c5f63306cef36da809df252e89",
          "publicAccess": "index_and_summary_only"
        }
      ],
      "pmTaskSnapshot": {
        "readOn": "2026-10-01",
        "scope": "Stored PM task rows, often older imports; planned dates, recorded status and actual-finish fields do not constitute inspection or current field verification. Read with the newer dated daily records.",
        "tasks": [
          {
            "name": "房屋拆除",
            "status": "已完成",
            "startDate": "2025-08-02",
            "finishDate": "2025-08-26",
            "actualFinishDate": "2025-08-26",
            "aiTableSyncedAt": "2026-10-01T04:39:24.718Z"
          },
          {
            "name": "施工准备与土方开挖",
            "status": "已完成",
            "startDate": "2025-09-14",
            "finishDate": "2025-10-06",
            "actualFinishDate": "2025-10-06",
            "aiTableSyncedAt": "2026-10-01T04:39:24.718Z"
          },
          {
            "name": "地下室框架",
            "status": "逾期完成",
            "startDate": "2025-10-07",
            "finishDate": "2026-02-19",
            "actualFinishDate": "2026-03-08",
            "aiTableSyncedAt": "2026-10-01T04:39:24.718Z"
          },
          {
            "name": "泳池",
            "status": "逾期完成",
            "startDate": "2026-03-18",
            "finishDate": "2026-03-27",
            "actualFinishDate": "2026-03-29",
            "aiTableSyncedAt": "2026-10-01T04:39:24.718Z"
          },
          {
            "name": "土方回填",
            "status": "已完成",
            "startDate": "2026-03-28",
            "finishDate": "2026-04-11",
            "actualFinishDate": "2026-04-01",
            "aiTableSyncedAt": "2026-10-01T04:39:24.718Z"
          },
          {
            "name": "一楼拓展楼板浇水泥",
            "status": "逾期完成",
            "startDate": "2026-03-30",
            "finishDate": "2026-05-19",
            "actualFinishDate": "2026-06-11",
            "aiTableSyncedAt": "2026-10-01T04:39:24.718Z"
          },
          {
            "name": "一楼楼板砌砖",
            "status": "已完成",
            "startDate": "2026-06-18",
            "finishDate": "2026-06-29",
            "actualFinishDate": "2026-06-24",
            "aiTableSyncedAt": "2026-10-01T04:39:24.718Z"
          },
          {
            "name": "二楼楼面模板钢筋浇水泥",
            "status": "逾期完成",
            "startDate": "2026-06-28",
            "finishDate": "2026-07-14",
            "actualFinishDate": "2026-07-22",
            "aiTableSyncedAt": "2026-10-01T04:39:24.718Z"
          },
          {
            "name": "二楼木架（水泥强度养护）",
            "status": "逾期完成",
            "startDate": "2026-07-26",
            "finishDate": "2026-08-06",
            "actualFinishDate": "2026-08-11",
            "aiTableSyncedAt": "2026-10-01T04:39:24.718Z"
          },
          {
            "name": "二楼砌砖+dincel水泥墙体",
            "status": "逾期完成",
            "startDate": "2026-08-30",
            "finishDate": "2026-09-05",
            "actualFinishDate": "2026-09-13",
            "aiTableSyncedAt": "2026-10-01T04:39:24.718Z"
          },
          {
            "name": "屋顶",
            "status": "已逾期",
            "startDate": "2026-09-01",
            "finishDate": "2026-09-20",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-10-01T04:39:24.718Z"
          },
          {
            "name": "gyprock(天花、墙、抹灰及修饰）",
            "status": "进行中",
            "startDate": "2026-09-23",
            "finishDate": "2026-11-04",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-10-01T04:39:24.718Z"
          },
          {
            "name": "Render wall 外墙粉刷",
            "status": "进行中",
            "startDate": "2026-09-24",
            "finishDate": "2026-11-09",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-10-01T04:39:24.718Z"
          },
          {
            "name": "门窗安装",
            "status": "进行中",
            "startDate": "2026-09-30",
            "finishDate": "2026-10-10",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-10-01T04:39:24.718Z"
          },
          {
            "name": "All service roughing in Air, Water, Power, Air Con 水电煤等排线",
            "status": "未开始",
            "startDate": "2026-10-02",
            "finishDate": "2026-10-12",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-10-01T04:39:24.718Z"
          },
          {
            "name": "室外园林（园建、绿化）",
            "status": "未开始",
            "startDate": "2026-11-03",
            "finishDate": "2026-11-26",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-10-01T04:39:24.718Z"
          },
          {
            "name": "室内乳胶漆",
            "status": "未开始",
            "startDate": "2026-11-05",
            "finishDate": "2026-11-25",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-10-01T04:39:24.718Z"
          },
          {
            "name": "室内防水及瓷砖",
            "status": "未开始",
            "startDate": "2026-11-05",
            "finishDate": "2026-12-22",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-10-01T04:39:24.718Z"
          },
          {
            "name": "室内地板",
            "status": "未开始",
            "startDate": "2026-11-26",
            "finishDate": "2026-12-13",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-10-01T04:39:24.718Z"
          },
          {
            "name": "楼梯/阳台拦杆、扶手",
            "status": "未开始",
            "startDate": "2026-12-02",
            "finishDate": "2026-12-13",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-10-01T04:39:24.718Z"
          },
          {
            "name": "柜体、卫浴、灯具安装",
            "status": "未开始",
            "startDate": "2026-12-05",
            "finishDate": "2027-01-20",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-10-01T04:39:24.718Z"
          },
          {
            "name": "OC验收",
            "status": "未开始",
            "startDate": "2027-01-24",
            "finishDate": "2027-02-14",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-10-01T04:39:24.718Z"
          },
          {
            "name": "OC以外场地装修",
            "status": "未开始",
            "startDate": "2027-02-15",
            "finishDate": "2027-03-31",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-10-01T04:39:24.718Z"
          }
        ]
      },
      "latestDailyRecordSummary": [
        {
          "date": "2026-10-01",
          "zh": "日报记录屋面工在场。",
          "en": "The daily record reports the roofer on site."
        },
        {
          "date": "2026-09-30",
          "zh": "两条日报记录木工和现场辅助工序。",
          "en": "Two daily records report carpentry and site assistance."
        }
      ]
    },
    {
      "project": "14 Wolsten Avenue",
      "address": "14 Wolsten Avenue, Turramurra, NSW 2074, Australia",
      "pages": {
        "en": "https://audbuild.com/projects/construction/14-wolsten-avenue-turramurra/",
        "zh": "https://audbuild.com/zh/projects/construction/14-wolsten-avenue-turramurra/"
      },
      "stage": {
        "en": "Carpentry, skylights and interior trade coordination",
        "zh": "木工、天窗与室内工序协调"
      },
      "recordReviewDate": "2026-10-01",
      "builderMasterReviewedAt": "2026-09-30",
      "builderAsRecorded": "AUSTRALIAN URBAN DIRECT IBUYING PTY",
      "photos": [
        {
          "url": "/assets/construction-progress/14-wolsten-avenue-turramurra/01-2026-10-01.webp",
          "date": "2026-10-01",
          "width": 1200,
          "height": 1600,
          "altZh": "住宅外墙与脚手架 · 14 Wolsten Avenue · 2026-10-01",
          "altEn": "House exterior and scaffolding at 14 Wolsten Avenue · 2026-10-01",
          "originalSha256": "9b911e68fba150eda711f9802a6f9a7d1c390b6b7b125bc930b3da384baa623c",
          "publicSha256": "6e022d8b712e21d50a69d077c70f85df9c1b5625251b267029061d2b60a2f4ef"
        },
        {
          "url": "/assets/construction-progress/14-wolsten-avenue-turramurra/02-2026-10-01.webp",
          "date": "2026-10-01",
          "width": 1200,
          "height": 1600,
          "altZh": "屋面边缘临时覆盖与框架 · 14 Wolsten Avenue · 2026-10-01",
          "altEn": "Temporary covering at the roof edge at 14 Wolsten Avenue · 2026-10-01",
          "originalSha256": "e035fe03f32341d57ec7cf7b8932d8158dc6932bd6be5f35d2f871b4db263daf",
          "publicSha256": "8f57ca2153dba98fcf4e205c2c44adaaf034f456fd158bc7a6dc22b63bd1e8af"
        },
        {
          "url": "/assets/construction-progress/14-wolsten-avenue-turramurra/03-2026-10-01.webp",
          "date": "2026-10-01",
          "width": 1200,
          "height": 1600,
          "altZh": "屋面边缘木构件与金属屋面 · 14 Wolsten Avenue · 2026-10-01",
          "altEn": "Roof-edge timber and metal roofing at 14 Wolsten Avenue · 2026-10-01",
          "originalSha256": "9b9ec3a1b4289840fd8a970d424a3d52874f67a984fb490c6981ade58727ac1c",
          "publicSha256": "ad6e7d4f2119b6c20c8dae99c0854b47a77e739c59a6f32636755fbfa894858c"
        },
        {
          "url": "/assets/construction-progress/14-wolsten-avenue-turramurra/04-2026-09-29.webp",
          "date": "2026-09-29",
          "width": 1200,
          "height": 1600,
          "altZh": "脚手架旁的施工材料 · 14 Wolsten Avenue · 2026-09-29",
          "altEn": "Materials beside exterior scaffolding at 14 Wolsten Avenue · 2026-09-29",
          "originalSha256": "4fdea88d12573b606fad403c0a44a314eefea59d5a8ad8e3d2e018749a7fec26",
          "publicSha256": "c2078970b2efa3c89ce549522d75bface05c977e50d418e35e174cc88d3cda1a"
        },
        {
          "url": "/assets/construction-progress/14-wolsten-avenue-turramurra/05-2026-09-29.webp",
          "date": "2026-09-29",
          "width": 1200,
          "height": 1600,
          "altZh": "外墙脚手架与材料区域 · 14 Wolsten Avenue · 2026-09-29",
          "altEn": "Exterior scaffolding and stored materials at 14 Wolsten Avenue · 2026-09-29",
          "originalSha256": "7dbc84d043b7121203a7ce6d737de1e82cfad9fbd1365516065e6add74026e50",
          "publicSha256": "2851dc655a43702df9a604ed0b5b92c9d698acb7f5be50a46bcc7ddf2662657d"
        },
        {
          "url": "/assets/construction-progress/14-wolsten-avenue-turramurra/06-2026-09-29.webp",
          "date": "2026-09-29",
          "width": 1200,
          "height": 1600,
          "altZh": "住宅外立面与脚手架 · 14 Wolsten Avenue · 2026-09-29",
          "altEn": "House exterior and scaffolding at 14 Wolsten Avenue · 2026-09-29",
          "originalSha256": "21d7d0875bfaaf7c4f600a6332d45561b5f859dc4c0e18a9ed1f916fd39400e9",
          "publicSha256": "f6aa5fee767b1324ff60142ead665d16af43b2aec06727f3a6c4d08d6938445a"
        },
        {
          "url": "/assets/construction-progress/14-wolsten-avenue-turramurra/07-2026-09-29.webp",
          "date": "2026-09-29",
          "width": 1200,
          "height": 1600,
          "altZh": "外墙施工和现场材料 · 14 Wolsten Avenue · 2026-09-29",
          "altEn": "Exterior work and site materials at 14 Wolsten Avenue · 2026-09-29",
          "originalSha256": "0ed31d9c1786dce92032f109d49af22bfffc194d6c942caf9c95eb02ab99858a",
          "publicSha256": "dbd36e572ffd4a3f0beca9e6ac7000d0e51d24a70025e23c9de802d1c7c12d3a"
        },
        {
          "url": "/assets/construction-progress/14-wolsten-avenue-turramurra/08-2026-09-29.webp",
          "date": "2026-09-29",
          "width": 1200,
          "height": 1600,
          "altZh": "室内施工与材料 · 14 Wolsten Avenue · 2026-09-29",
          "altEn": "Interior work area and materials at 14 Wolsten Avenue · 2026-09-29",
          "originalSha256": "3c66aac3dee62f925f7d9ca3af2852332e52d9a0b67e3b9078cf4b8c2ffe527a",
          "publicSha256": "c1b9752022ed78402544fdc14d7f5f861c156e81fa5a252ad24bc001223f0a84"
        }
      ],
      "originalReports": [
        {
          "id": "IR05",
          "number": "SVR25370.05A",
          "inspectionDate": "2026-05-25",
          "issuer": "QDE Engineering Pty Ltd",
          "scope": "1st Floor Slab",
          "pages": 5,
          "sha256": "5b94a2205b4bbac474596715f3069877da7f6777326019dbbf19bf90c551463a",
          "publicAccess": "index_and_summary_only"
        }
      ],
      "pmTaskSnapshot": {
        "readOn": "2026-10-01",
        "scope": "Stored PM task rows, often older imports; planned dates, recorded status and actual-finish fields do not constitute inspection or current field verification. Read with the newer dated daily records.",
        "tasks": [
          {
            "name": "房屋拆除",
            "status": "已完成",
            "startDate": "2025-09-27",
            "finishDate": "2025-10-15",
            "actualFinishDate": "2025-10-15",
            "aiTableSyncedAt": "2026-07-26T19:00:24.783Z"
          },
          {
            "name": "施工准备与土方开挖",
            "status": "已完成",
            "startDate": "2025-10-26",
            "finishDate": "2025-11-20",
            "actualFinishDate": "2025-11-20",
            "aiTableSyncedAt": "2026-07-26T19:00:24.783Z"
          },
          {
            "name": "地下室框架",
            "status": "已完成",
            "startDate": "2025-11-16",
            "finishDate": "2026-02-22",
            "actualFinishDate": "2026-02-22",
            "aiTableSyncedAt": "2026-07-26T19:00:24.783Z"
          },
          {
            "name": "一楼拓展楼板浇水泥",
            "status": "已完成",
            "startDate": "2026-03-18",
            "finishDate": "2026-04-03",
            "actualFinishDate": "2026-04-01",
            "aiTableSyncedAt": "2026-07-26T19:00:24.783Z"
          },
          {
            "name": "一楼楼板砌砖",
            "status": "已完成",
            "startDate": "2026-04-05",
            "finishDate": "2026-04-14",
            "actualFinishDate": "2026-04-13",
            "aiTableSyncedAt": "2026-07-26T19:00:24.783Z"
          },
          {
            "name": "脚手架搭设",
            "status": "逾期完成",
            "startDate": "2026-04-15",
            "finishDate": "2026-04-19",
            "actualFinishDate": "2026-05-22",
            "aiTableSyncedAt": "2026-07-26T19:00:24.783Z"
          },
          {
            "name": "二楼楼面模板钢筋浇水泥",
            "status": "逾期完成",
            "startDate": "2026-04-20",
            "finishDate": "2026-05-05",
            "actualFinishDate": "2026-06-03",
            "aiTableSyncedAt": "2026-07-26T19:00:24.783Z"
          },
          {
            "name": "二楼木架（水泥强度养护）",
            "status": "逾期完成",
            "startDate": "2026-06-16",
            "finishDate": "2026-06-23",
            "actualFinishDate": "2026-07-10",
            "aiTableSyncedAt": "2026-07-26T19:00:24.783Z"
          },
          {
            "name": "二楼砌砖+dincel水泥墙体",
            "status": "逾期完成",
            "startDate": "2026-06-24",
            "finishDate": "2026-07-04",
            "actualFinishDate": "2026-07-16",
            "aiTableSyncedAt": "2026-07-26T19:00:24.783Z"
          },
          {
            "name": "屋顶",
            "status": "已完成",
            "startDate": "2026-07-05",
            "finishDate": "2026-07-23",
            "actualFinishDate": "2026-07-23",
            "aiTableSyncedAt": "2026-07-26T19:00:24.783Z"
          },
          {
            "name": "门窗安装",
            "status": "未开始",
            "startDate": "2026-07-30",
            "finishDate": "2026-08-09",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:24.783Z"
          },
          {
            "name": "水电、煤气管线安装",
            "status": "未开始",
            "startDate": "2026-08-03",
            "finishDate": "2026-08-11",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:24.783Z"
          },
          {
            "name": "Render wall",
            "status": "未开始",
            "startDate": "2026-08-09",
            "finishDate": "2026-09-22",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:24.783Z"
          },
          {
            "name": "gyprock(天花、墙、抹灰及修饰）",
            "status": "未开始",
            "startDate": "2026-08-10",
            "finishDate": "2026-08-16",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:24.783Z"
          },
          {
            "name": "External Wall Painting 油墙",
            "status": "未开始",
            "startDate": "2026-09-09",
            "finishDate": "2026-09-22",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:24.783Z"
          },
          {
            "name": "室外园林（园建、绿化）",
            "status": "未开始",
            "startDate": "2026-09-14",
            "finishDate": "2026-10-08",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:24.783Z"
          },
          {
            "name": "室内乳胶漆",
            "status": "未开始",
            "startDate": "2026-09-20",
            "finishDate": "2026-10-11",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:24.783Z"
          },
          {
            "name": "室内防水及瓷砖",
            "status": "未开始",
            "startDate": "2026-09-21",
            "finishDate": "2026-11-07",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:24.783Z"
          },
          {
            "name": "EPS\\发泡陶瓷安装",
            "status": "未开始",
            "startDate": "2026-09-23",
            "finishDate": "2026-09-26",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:24.783Z"
          },
          {
            "name": "Remove Scaffolding 拆脚手架",
            "status": "未开始",
            "startDate": "2026-09-27",
            "finishDate": "2026-09-28",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:24.783Z"
          },
          {
            "name": "室内地板",
            "status": "未开始",
            "startDate": "2026-10-12",
            "finishDate": "2026-11-03",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:24.783Z"
          },
          {
            "name": "楼梯/阳台拦杆、扶手",
            "status": "未开始",
            "startDate": "2026-10-23",
            "finishDate": "2026-11-03",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:24.783Z"
          },
          {
            "name": "柜体、卫浴、灯具安装",
            "status": "未开始",
            "startDate": "2026-10-26",
            "finishDate": "2026-12-07",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:24.783Z"
          },
          {
            "name": "OC验收",
            "status": "未开始",
            "startDate": "2026-12-10",
            "finishDate": "2027-12-22",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:24.783Z"
          },
          {
            "name": "OC以外场地装修",
            "status": "未开始",
            "startDate": "2026-12-23",
            "finishDate": "2027-02-13",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:24.783Z"
          },
          {
            "name": "泳池结构",
            "status": "已完成",
            "startDate": null,
            "finishDate": "2025-11-13",
            "actualFinishDate": "2025-11-13",
            "aiTableSyncedAt": "2026-07-26T19:00:24.783Z"
          }
        ]
      },
      "latestDailyRecordSummary": [
        {
          "date": "2026-10-01",
          "zh": "日报记录现场辅助工及天窗相关活动。",
          "en": "Daily records report site assistance and skylight-related activity."
        },
        {
          "date": "2026-09-29",
          "zh": "日报记录木工制作天窗木架。",
          "en": "The daily record reports carpentry on the skylight frame."
        }
      ]
    },
    {
      "project": "75 Cutler Road",
      "address": "75 Cutler Road, Clontarf, NSW 2093, Australia",
      "pages": {
        "en": "https://audbuild.com/projects/construction/75-cutler-road-clontarf/",
        "zh": "https://audbuild.com/zh/projects/construction/75-cutler-road-clontarf/"
      },
      "stage": {
        "en": "Concrete and interior trade records",
        "zh": "混凝土与室内工序记录"
      },
      "recordReviewDate": "2026-10-01",
      "builderMasterReviewedAt": "2026-09-30",
      "builderAsRecorded": "AUSTRALIAN URBAN DIRECT IBUYING PTY",
      "photos": [
        {
          "url": "/assets/construction-progress/75-cutler-road-clontarf/01-2026-10-01.webp",
          "date": "2026-10-01",
          "width": 1200,
          "height": 1600,
          "altZh": "室内顶面与待施工材料 · 75 Cutler Road · 2026-10-01",
          "altEn": "Interior ceiling and stored materials at 75 Cutler Road · 2026-10-01",
          "originalSha256": "a5862a12f7dc68c522d3aa5c258cd929c3d1e5e800005aa8facb1266035c2e91",
          "publicSha256": "366c6299c144897a7d0cb3227a1be92c606810f692b71bdd150eec1d0b561e78"
        },
        {
          "url": "/assets/construction-progress/75-cutler-road-clontarf/02-2026-10-01.webp",
          "date": "2026-10-01",
          "width": 1200,
          "height": 1600,
          "altZh": "室内窗洞口与施工材料 · 75 Cutler Road · 2026-10-01",
          "altEn": "Interior window openings and materials at 75 Cutler Road · 2026-10-01",
          "originalSha256": "ebefd56fecda387800d45e88cb5885cc96017607c17d2905fc43fe4ad2f57de4",
          "publicSha256": "83d8490efda9895930e895aef89e6e0d0841c5322e3a5047a30c90d91f28b3f1"
        },
        {
          "url": "/assets/construction-progress/75-cutler-road-clontarf/03-2026-10-01.webp",
          "date": "2026-10-01",
          "width": 1200,
          "height": 1600,
          "altZh": "室内顶面、地面与材料 · 75 Cutler Road · 2026-10-01",
          "altEn": "Interior ceiling, floor and materials at 75 Cutler Road · 2026-10-01",
          "originalSha256": "eb59dd2b9dc96f77a792a261b9a4cd82814ab096aee78c9102248f99a9854897",
          "publicSha256": "a99a510ccd41000946d25640bdb85b84692a974ef8ca282064bd0c09ee8efda7"
        },
        {
          "url": "/assets/construction-progress/75-cutler-road-clontarf/04-2026-09-30.webp",
          "date": "2026-09-30",
          "width": 1200,
          "height": 1600,
          "altZh": "混凝土浇筑当天的室内施工区域 · 75 Cutler Road · 2026-09-30",
          "altEn": "Interior work area on the concrete-pour date at 75 Cutler Road · 2026-09-30",
          "originalSha256": "244a7a7c51a0b283acec40827f73f07f9af05a9e5d641e261417c822ecf60a2a",
          "publicSha256": "31c71b05bcef12197b80ce1ce689471599b36f706565cddaedf4fad3ccce7bd0"
        },
        {
          "url": "/assets/construction-progress/75-cutler-road-clontarf/05-2026-09-30.webp",
          "date": "2026-09-30",
          "width": 1200,
          "height": 1600,
          "altZh": "窗洞口外侧的施工脚手架 · 75 Cutler Road · 2026-09-30",
          "altEn": "Scaffolding outside a window opening at 75 Cutler Road · 2026-09-30",
          "originalSha256": "914162d89be82c8caab395c17a98152309296aa4f73376d2a87201acd6845a29",
          "publicSha256": "5eaa1b8e2b5672f9888e8e3cd437a6d20172ecf8aa62666282fc6999aab36611"
        },
        {
          "url": "/assets/construction-progress/75-cutler-road-clontarf/06-2026-09-30.webp",
          "date": "2026-09-30",
          "width": 1200,
          "height": 1600,
          "altZh": "窗框构件与外侧脚手架 · 75 Cutler Road · 2026-09-30",
          "altEn": "Window-frame components and scaffolding at 75 Cutler Road · 2026-09-30",
          "originalSha256": "50993c8dd997e27d31549b69076551e46afb40f5b75ae5544ece12f782205b6e",
          "publicSha256": "75cbdcb0aabaaa5de0bdfef30e6c25c7fe888757b32b7208ec931604d38f402e"
        },
        {
          "url": "/assets/construction-progress/75-cutler-road-clontarf/07-2026-09-30.webp",
          "date": "2026-09-30",
          "width": 1200,
          "height": 1600,
          "altZh": "施工区域、脚手架与泵管 · 75 Cutler Road · 2026-09-30",
          "altEn": "Work area, scaffolding and pump hose at 75 Cutler Road · 2026-09-30",
          "originalSha256": "8da3f606fd50685b500dc91bfd424f267a03e05e7df3bce3d5c5166e616086b1",
          "publicSha256": "dd4c2059dc20981113613a236daec6155996e23015b59740fd946e0ad589e7be"
        },
        {
          "url": "/assets/construction-progress/75-cutler-road-clontarf/08-2026-09-30.webp",
          "date": "2026-09-30",
          "width": 1200,
          "height": 1600,
          "altZh": "混凝土表面开口与管线 · 75 Cutler Road · 2026-09-30",
          "altEn": "Concrete opening and services pipework at 75 Cutler Road · 2026-09-30",
          "originalSha256": "b50fe46760a11313c1fe17e4421e89712605966d1241bbd6335be00bbc2c490d",
          "publicSha256": "97ce62ce1bcb7981f1739f1bc91fbbd7217ff630d40d7dce3af2b896edc4a661"
        }
      ],
      "originalReports": [],
      "pmTaskSnapshot": {
        "readOn": "2026-10-01",
        "scope": "Stored PM task rows, often older imports; planned dates, recorded status and actual-finish fields do not constitute inspection or current field verification. Read with the newer dated daily records.",
        "tasks": [
          {
            "name": "室内装修拆除",
            "status": "已完成",
            "startDate": "2025-08-03",
            "finishDate": "2025-10-22",
            "actualFinishDate": "2025-10-22",
            "aiTableSyncedAt": "2026-07-31T23:28:56.908Z"
          },
          {
            "name": "水电、煤气、空调管线",
            "status": "进行中",
            "startDate": "2026-07-26",
            "finishDate": "2026-08-12",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-31T23:28:56.908Z"
          },
          {
            "name": "电梯施工",
            "status": "进行中",
            "startDate": "2026-07-26",
            "finishDate": "2026-09-22",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-31T23:28:56.908Z"
          },
          {
            "name": "车库/连廊土建结构",
            "status": "未开始",
            "startDate": "2026-08-14",
            "finishDate": "2026-09-14",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-31T23:28:56.908Z"
          },
          {
            "name": "OC验收",
            "status": "计划中",
            "startDate": null,
            "finishDate": null,
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-31T23:28:56.908Z"
          },
          {
            "name": "外立面施工",
            "status": "计划中",
            "startDate": null,
            "finishDate": null,
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-31T23:28:56.908Z"
          },
          {
            "name": "室内乳胶漆",
            "status": "计划中",
            "startDate": null,
            "finishDate": null,
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-31T23:28:56.908Z"
          },
          {
            "name": "室内地板",
            "status": "计划中",
            "startDate": null,
            "finishDate": null,
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-31T23:28:56.908Z"
          },
          {
            "name": "室内结构拆改与加固",
            "status": "计划中",
            "startDate": null,
            "finishDate": null,
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-31T23:28:56.908Z"
          },
          {
            "name": "室内防水及瓷砖",
            "status": "计划中",
            "startDate": null,
            "finishDate": null,
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-31T23:28:56.908Z"
          },
          {
            "name": "室外园林（园建、绿化）",
            "status": "计划中",
            "startDate": null,
            "finishDate": null,
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-31T23:28:56.908Z"
          },
          {
            "name": "柜体、卫浴、灯具安装",
            "status": "计划中",
            "startDate": null,
            "finishDate": null,
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-31T23:28:56.908Z"
          },
          {
            "name": "楼梯/阳台拦杆、扶手",
            "status": "计划中",
            "startDate": null,
            "finishDate": null,
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-31T23:28:56.908Z"
          }
        ]
      },
      "latestDailyRecordSummary": [
        {
          "date": "2026-10-01",
          "zh": "日报记录水工及石膏板工序。",
          "en": "The daily record reports plumbing and plasterboard activity."
        },
        {
          "date": "2026-09-30",
          "zh": "现场人员称问题解决、混凝土浇筑完成；该简述没有逐项专业销项文件。",
          "en": "Site staff report an issue resolved and concreting finished; this brief record has no item-by-item professional close-out document."
        }
      ]
    },
    {
      "project": "306 Pittwater Road",
      "address": "306 Pittwater Road, East Ryde, NSW 2113, Australia",
      "pages": {
        "en": "https://audbuild.com/projects/construction/306-pittwater-road-east-ryde/",
        "zh": "https://audbuild.com/zh/projects/construction/306-pittwater-road-east-ryde/"
      },
      "stage": {
        "en": "Site coordination and material deliveries",
        "zh": "场地协调与材料到货"
      },
      "recordReviewDate": "2026-10-01",
      "builderMasterReviewedAt": "2026-09-30",
      "builderAsRecorded": null,
      "photos": [
        {
          "url": "/assets/construction-progress/306-pittwater-road-east-ryde/01-2026-09-28.webp",
          "date": "2026-09-28",
          "width": 1200,
          "height": 1600,
          "altZh": "施工围挡与现场通道 · 306 Pittwater Road · 2026-09-28",
          "altEn": "Construction fencing and site access path at 306 Pittwater Road · 2026-09-28",
          "originalSha256": "aafe3ab5d3c4a5dbd2d3ed219faf65a39ae59822f224178befa65959d3d587ca",
          "publicSha256": "adc99d830527adbd70c21c1e858e4ee8c21b9aea2c1e2e2b74f499ce9cbd820e"
        },
        {
          "url": "/assets/construction-progress/306-pittwater-road-east-ryde/02-2026-09-28.webp",
          "date": "2026-09-28",
          "width": 1200,
          "height": 1600,
          "altZh": "场地土方、材料与植被 · 306 Pittwater Road · 2026-09-28",
          "altEn": "Earthworks, materials and vegetation at 306 Pittwater Road · 2026-09-28",
          "originalSha256": "7f3b9aa96f1057241bef19f33effd7db399c40396f26c9067e478c2605839e23",
          "publicSha256": "ca74f40bfc4f357d1bf5f18437c980e25d84848c85158c46d4d9117e5967c48e"
        },
        {
          "url": "/assets/construction-progress/306-pittwater-road-east-ryde/03-2026-09-28.webp",
          "date": "2026-09-28",
          "width": 1200,
          "height": 1600,
          "altZh": "施工通道和围挡 · 306 Pittwater Road · 2026-09-28",
          "altEn": "Site access and fencing at 306 Pittwater Road · 2026-09-28",
          "originalSha256": "0accacb1a6f45a78a2e9bf6d73e71f9d23dad929ac61e7a6163d06f881416188",
          "publicSha256": "ce0dbc80e1d747ddd5389d4ca748dd7bf5821bcc9d9ac46512598bb5ff701662"
        },
        {
          "url": "/assets/construction-progress/306-pittwater-road-east-ryde/04-2026-09-26.webp",
          "date": "2026-09-26",
          "width": 1200,
          "height": 1600,
          "altZh": "场地通道与临时围挡 · 306 Pittwater Road · 2026-09-26",
          "altEn": "Access path and temporary fencing at 306 Pittwater Road · 2026-09-26",
          "originalSha256": "4d8d948684b362817d8d4fab8ee86d54848582792ee68503c0a99d7fc5526289",
          "publicSha256": "983145b1dafecd70bf4790795a2240e821c6e7d57f083d35536745009daa4723"
        },
        {
          "url": "/assets/construction-progress/306-pittwater-road-east-ryde/05-2026-09-26.webp",
          "date": "2026-09-26",
          "width": 1200,
          "height": 1600,
          "altZh": "成捆 Dincel 材料 · 306 Pittwater Road · 2026-09-26",
          "altEn": "Bundled Dincel materials at 306 Pittwater Road · 2026-09-26",
          "originalSha256": "4692e4c784aa097556ffca31b36108bc73e8da092f422a26d9454bd8d27b7378",
          "publicSha256": "ecd231bb516010971994480397260ea89e49a0d285614b46d66028cbc528c7a9"
        },
        {
          "url": "/assets/construction-progress/306-pittwater-road-east-ryde/06-2026-09-26.webp",
          "date": "2026-09-26",
          "width": 1200,
          "height": 1600,
          "altZh": "围挡内的通道与土方 · 306 Pittwater Road · 2026-09-26",
          "altEn": "Access and earthworks behind fencing at 306 Pittwater Road · 2026-09-26",
          "originalSha256": "2e5f3252069dfee8b927f42838ad8b8a9a6cf6583a683bf2fb11f6fdcc9c3734",
          "publicSha256": "14efb63090d7e69fe55436ccc37f70de3fffbaf78d44e7b2f84a540b588838cd"
        },
        {
          "url": "/assets/construction-progress/306-pittwater-road-east-ryde/07-2026-09-25.webp",
          "date": "2026-09-25",
          "width": 1200,
          "height": 1600,
          "altZh": "Dincel 材料交付后的堆放区域 · 306 Pittwater Road · 2026-09-25",
          "altEn": "Storage area following Dincel delivery at 306 Pittwater Road · 2026-09-25",
          "originalSha256": "446435a55d51c1f5dd25a5b19ce744d0b57d18253b9ac4b12c164d8e190f5db9",
          "publicSha256": "afad8644f5423e85f8b37ab6b9f05021e7f8d70d4d127ddaacc4056ea0b01510"
        },
        {
          "url": "/assets/construction-progress/306-pittwater-road-east-ryde/08-2026-09-25.webp",
          "date": "2026-09-25",
          "width": 1200,
          "height": 1600,
          "altZh": "现场堆放的 Dincel 材料 · 306 Pittwater Road · 2026-09-25",
          "altEn": "Dincel materials stored on site at 306 Pittwater Road · 2026-09-25",
          "originalSha256": "96330b30d2ff1927af85e87d80b1062365bb25022f6c84b48cfa84fd739b7ab9",
          "publicSha256": "49b762a2191f6f25e346c4d0672083ee8d85025b5ea6605ba00a92cf1d036b4b"
        }
      ],
      "originalReports": [],
      "pmTaskSnapshot": {
        "readOn": "2026-10-01",
        "scope": "Stored PM task rows, often older imports; planned dates, recorded status and actual-finish fields do not constitute inspection or current field verification. Read with the newer dated daily records.",
        "tasks": [
          {
            "name": "拆房",
            "status": "逾期完成",
            "startDate": "2026-02-08",
            "finishDate": "2026-05-19",
            "actualFinishDate": "2026-06-17",
            "aiTableSyncedAt": "2026-07-26T19:01:41.079Z"
          },
          {
            "name": "路基（含雨水）",
            "status": "未开始",
            "startDate": "2026-07-27",
            "finishDate": "2026-08-06",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:01:41.079Z"
          },
          {
            "name": "路面垫层",
            "status": "未开始",
            "startDate": "2026-08-07",
            "finishDate": "2026-08-12",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:01:41.079Z"
          },
          {
            "name": "路面面层",
            "status": "未开始",
            "startDate": "2026-08-13",
            "finishDate": "2026-08-18",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:01:41.079Z"
          },
          {
            "name": "雨水施工、验收",
            "status": "未开始",
            "startDate": "2026-08-19",
            "finishDate": "2026-08-26",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:01:41.079Z"
          }
        ]
      },
      "latestDailyRecordSummary": [
        {
          "date": "2026-09-28",
          "zh": "日报记载现场人员会面／协调，未提供新增工程量或验收结论。",
          "en": "The daily record reports an on-site meeting/coordination, without a new quantity or acceptance finding."
        },
        {
          "date": "2026-09-26",
          "zh": "日报记录 Dincel 材料到货。",
          "en": "The daily record reports delivery of Dincel materials."
        }
      ]
    },
    {
      "project": "51 Lamorna Avenue",
      "address": "51 Lamorna Avenue, Beecroft, NSW 2119, Australia",
      "pages": {
        "en": "https://audbuild.com/projects/construction/51-lamorna-avenue-beecroft/",
        "zh": "https://audbuild.com/zh/projects/construction/51-lamorna-avenue-beecroft/"
      },
      "stage": {
        "en": "Road and stormwater coordination following demolition",
        "zh": "拆除后道路与雨水工序协调"
      },
      "recordReviewDate": "2026-10-01",
      "builderMasterReviewedAt": "2026-09-30",
      "builderAsRecorded": "",
      "photos": [],
      "originalReports": [],
      "pmTaskSnapshot": {
        "readOn": "2026-10-01",
        "scope": "Stored PM task rows, often older imports; planned dates, recorded status and actual-finish fields do not constitute inspection or current field verification. Read with the newer dated daily records.",
        "tasks": [
          {
            "name": "拆房",
            "status": "逾期完成",
            "startDate": "2026-04-12",
            "finishDate": "2026-04-24",
            "actualFinishDate": "2026-05-10",
            "aiTableSyncedAt": "2026-07-26T19:00:56.986Z"
          },
          {
            "name": "道路施工",
            "status": "进行中",
            "startDate": "2026-06-04",
            "finishDate": "2026-08-19",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:56.986Z"
          },
          {
            "name": "雨水施工、验收",
            "status": "进行中",
            "startDate": "2026-06-14",
            "finishDate": "2026-08-14",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:56.986Z"
          },
          {
            "name": "雨水积水坑方案确认（约coucel会议），自然排入公园",
            "status": "进行中",
            "startDate": "2026-07-23",
            "finishDate": "2026-07-30",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:56.986Z"
          }
        ]
      },
      "latestDailyRecordSummary": []
    },
    {
      "project": "6 College Crescent",
      "address": "6 College Crescent, St Ives, NSW 2075, Australia",
      "pages": {
        "en": "https://audbuild.com/insights/6-college-construction-evidence/",
        "zh": "https://audbuild.com/zh/insights/6-college-construction-evidence/"
      },
      "stage": {
        "en": "Basement formwork removal and masonry",
        "zh": "地下室拆模与砌体作业"
      },
      "recordReviewDate": "2026-10-01",
      "builderMasterReviewedAt": "2026-09-30",
      "builderAsRecorded": "Opera Ridge Projects pty ltd",
      "photos": [
        {
          "url": "/assets/construction-progress/6-college-crescent-st-ives/01-2026-09-30.webp",
          "date": "2026-09-30",
          "width": 1600,
          "height": 1200,
          "altZh": "地下室开口与拆下的模板材料 · 6 College Crescent · 2026-09-30",
          "altEn": "Basement opening and removed formwork materials at 6 College Crescent · 2026-09-30",
          "originalSha256": "475a54073d477999321c859be8b1037b5d464ec333d16255f915b3b50577eea4",
          "publicSha256": "40973fdbae99fb6388ab8eb84923421d437384950c473cfde1388a029d5b96ca"
        },
        {
          "url": "/assets/construction-progress/6-college-crescent-st-ives/02-2026-09-30.webp",
          "date": "2026-09-30",
          "width": 1600,
          "height": 1200,
          "altZh": "地下室内部模板支撑作业 · 6 College Crescent · 2026-09-30",
          "altEn": "Work within the basement support area at 6 College Crescent · 2026-09-30",
          "originalSha256": "39cdeabca7060353b308c13dee2561c5fa81cd653c2eef4ed563f85ca9ab8179",
          "publicSha256": "c87736528925a586fd54cc0cec8602a18cba77817053cf10b858929b3cb7ca6e"
        },
        {
          "url": "/assets/construction-progress/6-college-crescent-st-ives/03-2026-09-30.webp",
          "date": "2026-09-30",
          "width": 1600,
          "height": 1200,
          "altZh": "地下室地面的模板与支架材料 · 6 College Crescent · 2026-09-30",
          "altEn": "Removed formwork and supports on the basement floor at 6 College Crescent · 2026-09-30",
          "originalSha256": "cc4a731298647396354b5927b94cd7945a9c00fb64c32cf9b2a51b322eb4724e",
          "publicSha256": "e2f4c68356b0a4331e228794b7a24ae31e4cb544a115f9e5364a13548003c035"
        },
        {
          "url": "/assets/construction-progress/6-college-crescent-st-ives/04-2026-09-30.webp",
          "date": "2026-09-30",
          "width": 1600,
          "height": 1200,
          "altZh": "地下室前方拆模材料 · 6 College Crescent · 2026-09-30",
          "altEn": "Removed materials in front of the basement at 6 College Crescent · 2026-09-30",
          "originalSha256": "877501237f0123354b3ec4696efd745ad6c99c9767875db4c7a1fbb12dde1009",
          "publicSha256": "8cc3abbe26b7cfa4cbf420a3c8d421f127a04d7fada22f15f45a96d26f3b665e"
        },
        {
          "url": "/assets/construction-progress/6-college-crescent-st-ives/05-2026-09-30.webp",
          "date": "2026-09-30",
          "width": 1600,
          "height": 1200,
          "altZh": "现场清运箱与拆模材料 · 6 College Crescent · 2026-09-30",
          "altEn": "Skip bin and formwork materials at 6 College Crescent · 2026-09-30",
          "originalSha256": "dfc3b86891a760af3a4feb46ca9efc9f97f2fcbc68a6b6e9b24cac05b62096a9",
          "publicSha256": "d34e918bdcee1f86ab2c04c49fd381a7b7ed1f2d17dc4a956d51dff2aad01428"
        },
        {
          "url": "/assets/construction-progress/6-college-crescent-st-ives/06-2026-09-30.webp",
          "date": "2026-09-30",
          "width": 1600,
          "height": 1200,
          "altZh": "地下室开口与支架材料 · 6 College Crescent · 2026-09-30",
          "altEn": "Basement opening and support materials at 6 College Crescent · 2026-09-30",
          "originalSha256": "478bc60cf44277419afae95ad2928a26b6fc6361510071fdd23093ad90380c3d",
          "publicSha256": "ac3bb2d51a5090d8e16658727c80659f23aff13fe7ff69e1967effa0f6fd06a3"
        },
        {
          "url": "/assets/construction-progress/6-college-crescent-st-ives/07-2026-09-29.webp",
          "date": "2026-09-29",
          "width": 1600,
          "height": 1200,
          "altZh": "砖墙施工与现场材料 · 6 College Crescent · 2026-09-29",
          "altEn": "Brickwork and site materials at 6 College Crescent · 2026-09-29",
          "originalSha256": "99ff7e6468eb8c6c40709f0933b614655451b60d7ed20beb31b7f9bd765bb89e",
          "publicSha256": "5cf9b6b2b71b3c69c3659c08fcb63cc0860d5264676c6fa7a388f5159f7e8c12"
        },
        {
          "url": "/assets/construction-progress/6-college-crescent-st-ives/08-2026-09-29.webp",
          "date": "2026-09-29",
          "width": 1600,
          "height": 1200,
          "altZh": "现场清运箱与施工废料 · 6 College Crescent · 2026-09-29",
          "altEn": "Skip bin and construction debris at 6 College Crescent · 2026-09-29",
          "originalSha256": "11112c18c295676c6d58699ccc7b707eb5b79e59e93dd696950f51dadba60d2f",
          "publicSha256": "e4222640780b9900c50469c1cdae45c372449f7762030aff039918b81156053b"
        }
      ],
      "originalReports": [
        {
          "id": "IR11",
          "number": "SVR26128.01A",
          "inspectionDate": "2026-07-31",
          "issuer": "QDE Engineering Pty Ltd",
          "scope": "BASEMENT FOOTING",
          "pages": 3,
          "sha256": "e29e4cf2af37471827ae497532d6507866ef2dad3229d84b27b9b3c044e0b1ba",
          "publicAccess": "index_and_summary_only"
        },
        {
          "id": "IR12",
          "number": "SVR26128.03A",
          "inspectionDate": "2026-09-22",
          "issuer": "QDE Engineering Pty Ltd",
          "scope": "SWIMMING POOL",
          "pages": 3,
          "sha256": "f9f079d15580ddbc8a0c138e981c97cc87dfdbc3c0ec54494cc02c8a8f15a0a8",
          "publicAccess": "index_and_summary_only"
        },
        {
          "id": "IR13",
          "number": "SVR26128.03A",
          "inspectionDate": "2026-09-02",
          "issuer": "QDE Engineering Pty Ltd",
          "scope": "Ground floor slab",
          "pages": 3,
          "sha256": "be9201a4845a89300ddbc66151d4a4dfa15a109a32ba6771e4e2fc478dbade16",
          "publicAccess": "index_and_summary_only"
        }
      ],
      "pmTaskSnapshot": {
        "readOn": "2026-10-01",
        "scope": "Stored PM task rows, often older imports; planned dates, recorded status and actual-finish fields do not constitute inspection or current field verification. Read with the newer dated daily records.",
        "tasks": [
          {
            "name": "开工",
            "status": "已完成",
            "startDate": "2026-05-07",
            "finishDate": "2026-05-26",
            "actualFinishDate": "2026-05-17",
            "aiTableSyncedAt": "2026-07-26T19:00:18.971Z"
          },
          {
            "name": "土方开挖",
            "status": "逾期完成",
            "startDate": "2026-06-01",
            "finishDate": "2026-06-16",
            "actualFinishDate": "2026-06-22",
            "aiTableSyncedAt": "2026-07-26T19:00:18.971Z"
          },
          {
            "name": "地下室底板浇筑",
            "status": "进行中",
            "startDate": "2026-07-13",
            "finishDate": "2026-08-05",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:18.971Z"
          },
          {
            "name": "地下室Dincle墙体浇筑",
            "status": "未开始",
            "startDate": "2026-08-07",
            "finishDate": "2026-08-22",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:18.971Z"
          },
          {
            "name": "地下室顶板浇筑",
            "status": "未开始",
            "startDate": "2026-09-02",
            "finishDate": "2026-09-11",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:18.971Z"
          },
          {
            "name": "OSD和WRT施工",
            "status": "未开始",
            "startDate": "2026-09-10",
            "finishDate": "2026-09-20",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:18.971Z"
          },
          {
            "name": "游泳池施工",
            "status": "未开始",
            "startDate": "2026-09-10",
            "finishDate": "2026-09-20",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:18.971Z"
          },
          {
            "name": "一楼楼板砌砖",
            "status": "未开始",
            "startDate": "2026-10-16",
            "finishDate": "2026-10-26",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:18.971Z"
          },
          {
            "name": "二楼楼面模板钢筋浇水泥",
            "status": "未开始",
            "startDate": "2026-11-04",
            "finishDate": "2026-11-20",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:18.971Z"
          },
          {
            "name": "二楼木架（水泥强度养护）",
            "status": "未开始",
            "startDate": "2026-11-15",
            "finishDate": "2026-11-28",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:18.971Z"
          },
          {
            "name": "Bricks delivery & Materials 物料进场",
            "status": "未开始",
            "startDate": "2026-11-29",
            "finishDate": "2026-11-29",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:18.971Z"
          },
          {
            "name": "Bricks wall construction 健砖墙",
            "status": "未开始",
            "startDate": "2026-11-30",
            "finishDate": "2026-12-05",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:18.971Z"
          },
          {
            "name": "二楼砌砖+dincel水泥墙体",
            "status": "未开始",
            "startDate": "2026-12-06",
            "finishDate": "2026-12-21",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:18.971Z"
          },
          {
            "name": "外墙抹灰",
            "status": "未开始",
            "startDate": "2026-12-22",
            "finishDate": "2027-01-25",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:18.971Z"
          },
          {
            "name": "屋顶",
            "status": "未开始",
            "startDate": "2026-12-22",
            "finishDate": "2026-12-30",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:18.971Z"
          },
          {
            "name": "门窗安装",
            "status": "未开始",
            "startDate": "2027-01-01",
            "finishDate": "2027-01-10",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:18.971Z"
          },
          {
            "name": "gyprock(天花、墙、抹灰及修饰）",
            "status": "未开始",
            "startDate": "2027-01-11",
            "finishDate": "2027-02-22",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:18.971Z"
          },
          {
            "name": "外立面装饰线条及油漆",
            "status": "未开始",
            "startDate": "2027-01-26",
            "finishDate": "2027-02-25",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:18.971Z"
          },
          {
            "name": "室外园林（园建、绿化）",
            "status": "未开始",
            "startDate": "2027-02-17",
            "finishDate": "2027-03-13",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:18.971Z"
          },
          {
            "name": "室内墙面乳胶漆（门）",
            "status": "未开始",
            "startDate": "2027-02-23",
            "finishDate": "2027-03-15",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:18.971Z"
          },
          {
            "name": "室内防水及瓷砖",
            "status": "未开始",
            "startDate": "2027-02-23",
            "finishDate": "2027-04-14",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:18.971Z"
          },
          {
            "name": "室内地板",
            "status": "未开始",
            "startDate": "2027-03-16",
            "finishDate": "2027-04-05",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:18.971Z"
          },
          {
            "name": "楼梯/阳台拦杆、扶手",
            "status": "未开始",
            "startDate": "2027-03-22",
            "finishDate": "2027-04-05",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:18.971Z"
          },
          {
            "name": "柜体、卫浴、灯具安装",
            "status": "未开始",
            "startDate": "2027-03-24",
            "finishDate": "2027-05-09",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:18.971Z"
          }
        ]
      },
      "latestDailyRecordSummary": [
        {
          "date": "2026-09-30",
          "zh": "日报记录地下室模板支架拆除、模板工序及废料箱更换。",
          "en": "Daily records report basement formwork/support removal and a skip changeover."
        },
        {
          "date": "2026-09-29",
          "zh": "日报记录砌砖与场地清理。",
          "en": "The daily record reports brickwork and site clearing."
        }
      ]
    },
    {
      "project": "12 Lennox Street",
      "address": "12 Lennox Street, Gordon, NSW 2072, Australia",
      "pages": {
        "en": "https://audbuild.com/projects/construction/12-lennox-street-gordon/",
        "zh": "https://audbuild.com/zh/projects/construction/12-lennox-street-gordon/"
      },
      "stage": {
        "en": "Formwork and services following a Dincel pour",
        "zh": "Dincel 浇筑后模板与管线作业"
      },
      "recordReviewDate": "2026-10-01",
      "builderMasterReviewedAt": "2026-09-30",
      "builderAsRecorded": "Sunny Building Construction Pty Ltd",
      "photos": [
        {
          "url": "/assets/construction-progress/12-lennox-street-gordon/01-2026-10-01.webp",
          "date": "2026-10-01",
          "width": 1600,
          "height": 1200,
          "altZh": "地下结构与模板材料区域 · 12 Lennox Street · 2026-10-01",
          "altEn": "Basement structure and formwork material area at 12 Lennox Street · 2026-10-01",
          "originalSha256": "ea25758e56a7e16d6f1db6c8b0ca6fec54a231160c32f94291d3fabf116ede09",
          "publicSha256": "3774888007569b302cc14fd8054317cef802b1e8e632c2ce58086b6bda8017b9"
        },
        {
          "url": "/assets/construction-progress/12-lennox-street-gordon/02-2026-09-30.webp",
          "date": "2026-09-30",
          "width": 1600,
          "height": 1200,
          "altZh": "模板材料与场地清理区域 · 12 Lennox Street · 2026-09-30",
          "altEn": "Formwork materials and site-clearing area at 12 Lennox Street · 2026-09-30",
          "originalSha256": "f05f75a980febda0ade461433a943e25e19a7a319d9d76553dc7f61b0af0bea2",
          "publicSha256": "11ffad0faabc8546dab6fc9458acd41e04dc01c7a20ebc7ea36354c12c6b430d"
        },
        {
          "url": "/assets/construction-progress/12-lennox-street-gordon/03-2026-10-01.webp",
          "date": "2026-10-01",
          "width": 1600,
          "height": 1200,
          "altZh": "地下结构周边场地清理 · 12 Lennox Street · 2026-10-01",
          "altEn": "Site clearing around the basement structure at 12 Lennox Street · 2026-10-01",
          "originalSha256": "944dd1f4b00fcc24ff1bbe439241c96183d234055324323f229b1dc59195a400",
          "publicSha256": "c8966e36c3ace66d2f85823cbdcff2e14fe81f178d84e03c39b7b2b8f47a61f2"
        },
        {
          "url": "/assets/construction-progress/12-lennox-street-gordon/04-2026-10-01.webp",
          "date": "2026-10-01",
          "width": 1600,
          "height": 1200,
          "altZh": "清运箱更换及现场材料 · 12 Lennox Street · 2026-10-01",
          "altEn": "Skip exchange and construction materials at 12 Lennox Street · 2026-10-01",
          "originalSha256": "8cb3e3dbec90305a662ccd1cf9674337784cc7c75478621c74eee4887bf81f4f",
          "publicSha256": "3cc0408596163a91fc5c0c82641d5b7e94be3f8385377db427fb176424acd1fd"
        },
        {
          "url": "/assets/construction-progress/12-lennox-street-gordon/05-2026-10-01.webp",
          "date": "2026-10-01",
          "width": 1600,
          "height": 1200,
          "altZh": "地下结构墙体与施工区域 · 12 Lennox Street · 2026-10-01",
          "altEn": "Basement walls and work area at 12 Lennox Street · 2026-10-01",
          "originalSha256": "0741057fa1209f88c9acf72f2e795d49273908963ded0ebe4ab738a518ef5d45",
          "publicSha256": "7fbf959c88e9786f32b9897a7d6715331580587156df6d4745fa76472f52b01c"
        },
        {
          "url": "/assets/construction-progress/12-lennox-street-gordon/06-2026-10-01.webp",
          "date": "2026-10-01",
          "width": 1600,
          "height": 1200,
          "altZh": "模板与钢筋材料堆放区域 · 12 Lennox Street · 2026-10-01",
          "altEn": "Stored formwork and reinforcement materials at 12 Lennox Street · 2026-10-01",
          "originalSha256": "75f10da2fec463ddd7841095fd430a0ef9c6eef0a1156fed62ebfd8e7b6bdf12",
          "publicSha256": "9c2054a46f7bdd8dce924c8ac2dba91388aa613b08f9562460e33d032f7a84d9"
        },
        {
          "url": "/assets/construction-progress/12-lennox-street-gordon/07-2026-09-30.webp",
          "date": "2026-09-30",
          "width": 1600,
          "height": 1200,
          "altZh": "结构周边场地与材料 · 12 Lennox Street · 2026-09-30",
          "altEn": "Materials and work area around the structure at 12 Lennox Street · 2026-09-30",
          "originalSha256": "5e338cd3c28250ab17882be92ade3b225eb5e37162d3c0a31961461873d8b67c",
          "publicSha256": "7d6944b434b89563b6dee968bc0f69f7dd2ec126098d2523495040b36a1bde91"
        },
        {
          "url": "/assets/construction-progress/12-lennox-street-gordon/08-2026-09-30.webp",
          "date": "2026-09-30",
          "width": 1600,
          "height": 1200,
          "altZh": "模板材料和清理中的区域 · 12 Lennox Street · 2026-09-30",
          "altEn": "Formwork materials during site clearing at 12 Lennox Street · 2026-09-30",
          "originalSha256": "76f023df98080359e26b30a89c8aed9bf834b32dae1cbac5cd566209c1380a5a",
          "publicSha256": "02736fc93fa607f3af920caca4a101c3017fe2820202e953e9244d60fc71d13a"
        }
      ],
      "originalReports": [
        {
          "id": "IR02",
          "number": "CDC CK25121/01; ECBCE REF 12626",
          "inspectionDate": "2026-09-04",
          "issuer": "Exclusive Certifiers Pty Ltd",
          "scope": "basment slab / Footings and Slabs",
          "pages": 2,
          "sha256": "b9079051c77cfb00316945deaa4ebfcb2c6be4f97897e46fba4b5ca391a04c60",
          "publicAccess": "index_and_summary_only"
        },
        {
          "id": "IR03",
          "number": "SVR25337.02A",
          "inspectionDate": "2026-09-04",
          "issuer": "QDE Engineering Pty Ltd",
          "scope": "Basement slab and footing",
          "pages": 3,
          "sha256": "40cf1a05fd36086e0ffcb0bac702746c8bd9c5c7860e1b6aac9e591ce92649ea",
          "publicAccess": "index_and_summary_only"
        },
        {
          "id": "IR04",
          "number": "SVR25337.03A",
          "inspectionDate": "2026-09-25",
          "issuer": "QDE Engineering Pty Ltd",
          "scope": "Dincel wall",
          "pages": 3,
          "sha256": "c96a96cdc1439e8734eff1c7e8fa2cac23cc67bea7d3fb1d8427a74c974ac28c",
          "publicAccess": "index_and_summary_only"
        }
      ],
      "pmTaskSnapshot": {
        "readOn": "2026-10-01",
        "scope": "Stored PM task rows, often older imports; planned dates, recorded status and actual-finish fields do not constitute inspection or current field verification. Read with the newer dated daily records.",
        "tasks": [
          {
            "name": "开工",
            "status": "已完成",
            "startDate": "2026-05-11",
            "finishDate": "2026-06-14",
            "actualFinishDate": "2026-06-14",
            "aiTableSyncedAt": "2026-07-26T19:00:37.993Z"
          },
          {
            "name": "拆房",
            "status": "已完成",
            "startDate": "2026-06-14",
            "finishDate": "2026-07-06",
            "actualFinishDate": "2026-07-02",
            "aiTableSyncedAt": "2026-07-26T19:00:37.993Z"
          },
          {
            "name": "土方开挖",
            "status": "进行中",
            "startDate": "2026-07-10",
            "finishDate": "2026-08-12",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:37.993Z"
          },
          {
            "name": "游泳池施工",
            "status": "已完成",
            "startDate": "2026-07-16",
            "finishDate": "2026-07-27",
            "actualFinishDate": "2026-07-26",
            "aiTableSyncedAt": "2026-07-26T19:00:37.993Z"
          },
          {
            "name": "OSD和WRT施工",
            "status": "未开始",
            "startDate": "2026-07-31",
            "finishDate": "2026-08-09",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:37.993Z"
          },
          {
            "name": "地下室底板浇筑",
            "status": "未开始",
            "startDate": "2026-08-06",
            "finishDate": "2026-08-17",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:37.993Z"
          },
          {
            "name": "地下室Dincle墙体浇筑",
            "status": "未开始",
            "startDate": "2026-08-18",
            "finishDate": "2026-08-30",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:37.993Z"
          },
          {
            "name": "地下室顶板浇筑",
            "status": "未开始",
            "startDate": "2026-08-31",
            "finishDate": "2026-09-12",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:37.993Z"
          },
          {
            "name": "一楼楼板砌砖",
            "status": "未开始",
            "startDate": "2026-09-18",
            "finishDate": "2026-09-27",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:37.993Z"
          },
          {
            "name": "二楼楼面模板钢筋浇水泥",
            "status": "未开始",
            "startDate": "2026-09-30",
            "finishDate": "2026-10-17",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:37.993Z"
          },
          {
            "name": "Electrical, Plumbing Collar installation, etc. 水电排管-水泥套筒",
            "status": "未开始",
            "startDate": "2026-10-11",
            "finishDate": "2026-10-12",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:37.993Z"
          },
          {
            "name": "Top Steel 钢筋施工",
            "status": "未开始",
            "startDate": "2026-10-13",
            "finishDate": "2026-10-15",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:37.993Z"
          },
          {
            "name": "Concreting 水泥施工日",
            "status": "未开始",
            "startDate": "2026-10-16",
            "finishDate": "2026-10-17",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:37.993Z"
          },
          {
            "name": "二楼木架（水泥强度养护）",
            "status": "未开始",
            "startDate": "2026-10-20",
            "finishDate": "2026-11-02",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:37.993Z"
          },
          {
            "name": "二楼砌砖+dincel水泥墙体",
            "status": "未开始",
            "startDate": "2026-11-03",
            "finishDate": "2026-11-09",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:37.993Z"
          },
          {
            "name": "屋顶彩钢瓦",
            "status": "未开始",
            "startDate": "2026-11-10",
            "finishDate": "2026-11-29",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:37.993Z"
          }
        ]
      },
      "latestDailyRecordSummary": [
        {
          "date": "2026-10-01",
          "zh": "日报记录模板制作、管线排布，以及为钢筋安装腾出作业区域。",
          "en": "Daily records report formwork, plumbing rough-in and preparation of space for reinforcement installation."
        }
      ]
    },
    {
      "project": "3 Amesbury Avenue",
      "address": "3 Amesbury Avenue, St Ives, NSW 2075, Australia",
      "pages": {
        "en": "https://audbuild.com/projects/construction/3-amesbury-avenue-st-ives/",
        "zh": "https://audbuild.com/zh/projects/construction/3-amesbury-avenue-st-ives/"
      },
      "stage": {
        "en": "Demolition and survey preparation",
        "zh": "拆除与后续测量准备"
      },
      "recordReviewDate": "2026-10-01",
      "builderMasterReviewedAt": "2026-09-30",
      "builderAsRecorded": "Opera Ridge Projects pty ltd",
      "photos": [
        {
          "url": "/assets/construction-progress/3-amesbury-avenue-st-ives/01-2026-09-30.webp",
          "date": "2026-09-30",
          "width": 1600,
          "height": 1200,
          "altZh": "挖掘机与拆除后的场地 · 3 Amesbury Avenue · 2026-09-30",
          "altEn": "Excavator and cleared demolition area at 3 Amesbury Avenue · 2026-09-30",
          "originalSha256": "1cc18e7e89026c7396663d6674ebe34cf99bca56db743e60c77f91bd5911577a",
          "publicSha256": "590294e25127f82cb3d1e2ad04221c5e75cbcb3bdc9ca05e29ba173aac446c94"
        },
        {
          "url": "/assets/construction-progress/3-amesbury-avenue-st-ives/02-2026-09-30.webp",
          "date": "2026-09-30",
          "width": 1200,
          "height": 1600,
          "altZh": "现场边坡与植被 · 3 Amesbury Avenue · 2026-09-30",
          "altEn": "Site slope and vegetation at 3 Amesbury Avenue · 2026-09-30",
          "originalSha256": "5ff9092711fcae4dfb82faf59dd3d5676f98524495b682203d20d14965b134ae",
          "publicSha256": "fc6e868391ee186d8490ab0115580d4f12cd9b815d7ac49c664f79e98777b29a"
        },
        {
          "url": "/assets/construction-progress/3-amesbury-avenue-st-ives/03-2026-09-30.webp",
          "date": "2026-09-30",
          "width": 1600,
          "height": 1200,
          "altZh": "挖掘机、拆除材料及场地 · 3 Amesbury Avenue · 2026-09-30",
          "altEn": "Excavator, demolition debris and site at 3 Amesbury Avenue · 2026-09-30",
          "originalSha256": "bd66e547cfd312dde18da1111d9a0d1b4481e4177be3eede0d11f5377582b5a6",
          "publicSha256": "0b3fdd3f7a6faba8915b3360553f913d7bbdb9fc3003deb229a4d30f1ea857dc"
        },
        {
          "url": "/assets/construction-progress/3-amesbury-avenue-st-ives/04-2026-09-29.webp",
          "date": "2026-09-29",
          "width": 1600,
          "height": 1200,
          "altZh": "挖机和拆除材料区域 · 3 Amesbury Avenue · 2026-09-29",
          "altEn": "Excavator and demolition material area at 3 Amesbury Avenue · 2026-09-29",
          "originalSha256": "76d69925a532aaeed0eb908911b26110c13f45b190a0b83f70f849cb8b45f689",
          "publicSha256": "eeaa8e727ec37285a012ecd7aa252f50bc2860db8c51c3ee8f34ead57f4cdf89"
        },
        {
          "url": "/assets/construction-progress/3-amesbury-avenue-st-ives/05-2026-09-29.webp",
          "date": "2026-09-29",
          "width": 1600,
          "height": 1200,
          "altZh": "拆除后的砖块和材料 · 3 Amesbury Avenue · 2026-09-29",
          "altEn": "Brick and demolition debris at 3 Amesbury Avenue · 2026-09-29",
          "originalSha256": "35d326f53446059dbb5814cb5574ad1cb6e2c63887981a9a1e03f060c2c07ef0",
          "publicSha256": "61f35a4b43df46ac38355015aaa3d2203fb84cb65bdedf79431bfd72a9a13aa6"
        },
        {
          "url": "/assets/construction-progress/3-amesbury-avenue-st-ives/06-2026-09-29.webp",
          "date": "2026-09-29",
          "width": 1600,
          "height": 1200,
          "altZh": "挖掘机与拆除废料 · 3 Amesbury Avenue · 2026-09-29",
          "altEn": "Excavator and demolition debris at 3 Amesbury Avenue · 2026-09-29",
          "originalSha256": "85732b5f74c8a27f666712919d7c85f2778c5bd4334319c0b3b0edc97b251fb7",
          "publicSha256": "ccab9241ec710f9a85c1cfde2125f0fc4d027b9118d91ca05321d9ca92ecfeb9"
        },
        {
          "url": "/assets/construction-progress/3-amesbury-avenue-st-ives/07-2026-09-28.webp",
          "date": "2026-09-28",
          "width": 1600,
          "height": 1200,
          "altZh": "挖掘机与现场土方 · 3 Amesbury Avenue · 2026-09-28",
          "altEn": "Excavator and earthworks at 3 Amesbury Avenue · 2026-09-28",
          "originalSha256": "e0152303ff42ce827dfd3e47979492fbec38593d1c9e6ba90457ec3947481b4e",
          "publicSha256": "1675a5163c4bcec933eaddc6d11a84e0d5bd6081ae399927ebc69f0382afe791"
        },
        {
          "url": "/assets/construction-progress/3-amesbury-avenue-st-ives/08-2026-09-28.webp",
          "date": "2026-09-28",
          "width": 1600,
          "height": 1200,
          "altZh": "拆除场地与挖掘机 · 3 Amesbury Avenue · 2026-09-28",
          "altEn": "Demolition site and excavator at 3 Amesbury Avenue · 2026-09-28",
          "originalSha256": "d7acf7c7b74e8fa6cf2ca0f0c0b66bec9b16a003494b573fba9097c4de389014",
          "publicSha256": "d2789eca7a4842812c20b6932e021d0d9fc1ec368c9c32472c5ce890e4a437de"
        }
      ],
      "originalReports": [],
      "pmTaskSnapshot": {
        "readOn": "2026-10-01",
        "scope": "Stored PM task rows, often older imports; planned dates, recorded status and actual-finish fields do not constitute inspection or current field verification. Read with the newer dated daily records.",
        "tasks": [
          {
            "name": "拆房",
            "status": "未开始",
            "startDate": "2026-07-27",
            "finishDate": "2026-08-19",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:51.479Z"
          },
          {
            "name": "土方开挖",
            "status": "未开始",
            "startDate": "2026-08-20",
            "finishDate": "2026-08-31",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:51.479Z"
          },
          {
            "name": "地下室底板浇筑",
            "status": "未开始",
            "startDate": "2026-08-31",
            "finishDate": "2026-09-16",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:51.479Z"
          },
          {
            "name": "地下室Dincle墙体浇筑",
            "status": "未开始",
            "startDate": "2026-09-17",
            "finishDate": "2026-10-06",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:51.479Z"
          },
          {
            "name": "游泳池施工",
            "status": "未开始",
            "startDate": "2026-10-07",
            "finishDate": "2026-10-17",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:51.479Z"
          },
          {
            "name": "地下室顶板浇筑",
            "status": "未开始",
            "startDate": "2026-10-19",
            "finishDate": "2026-11-07",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:51.479Z"
          },
          {
            "name": "一楼拓展楼板浇筑",
            "status": "未开始",
            "startDate": "2026-11-10",
            "finishDate": "2026-11-22",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:51.479Z"
          },
          {
            "name": "OSD和WRT施工",
            "status": "未开始",
            "startDate": "2026-11-22",
            "finishDate": "2026-12-01",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:51.479Z"
          },
          {
            "name": "一楼楼板砌砖",
            "status": "未开始",
            "startDate": "2026-12-02",
            "finishDate": "2026-12-13",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:51.479Z"
          },
          {
            "name": "脚手架搭设",
            "status": "未开始",
            "startDate": "2026-12-14",
            "finishDate": "2026-12-16",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:51.479Z"
          },
          {
            "name": "二楼楼面模板钢筋浇水泥",
            "status": "未开始",
            "startDate": "2026-12-17",
            "finishDate": "2027-01-03",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:51.479Z"
          },
          {
            "name": "二楼木架（水泥强度养护）",
            "status": "未开始",
            "startDate": "2027-01-06",
            "finishDate": "2027-01-19",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:51.479Z"
          },
          {
            "name": "二楼砌砖+dincel水泥墙体",
            "status": "未开始",
            "startDate": "2027-01-20",
            "finishDate": "2027-01-27",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:51.479Z"
          },
          {
            "name": "屋顶彩钢瓦",
            "status": "未开始",
            "startDate": "2027-01-28",
            "finishDate": "2027-02-16",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:51.479Z"
          },
          {
            "name": "开工",
            "status": "进行中",
            "startDate": null,
            "finishDate": "2026-07-27",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:00:51.479Z"
          }
        ]
      },
      "latestDailyRecordSummary": [
        {
          "date": "2026-10-01",
          "zh": "拆除继续；记录购置树木及邻地边界保护材料，泳池承包方安排下周启动讨论。这是计划，不是已开工泳池或完工。",
          "en": "Demolition continued; the record reports purchasing tree and boundary protection materials and discussing a pool contractor start for the following week. The pool work is planned, rather than established as started or completed."
        },
        {
          "date": "2026-09-30",
          "zh": "日报称原泳池和基础仍有混凝土需破拆。",
          "en": "The daily record reports remaining concrete from the old pool and foundations requiring demolition."
        }
      ]
    },
    {
      "project": "20 Albert Street",
      "address": "20 Albert Street, Gladesville, NSW 2111, Australia",
      "pages": {
        "en": "https://audbuild.com/projects/construction/20-albert-street-gladesville/",
        "zh": "https://audbuild.com/zh/projects/construction/20-albert-street-gladesville/"
      },
      "stage": {
        "en": "Site preparation and monitoring",
        "zh": "场地准备与巡查"
      },
      "recordReviewDate": "2026-10-01",
      "builderMasterReviewedAt": "2026-09-30",
      "builderAsRecorded": "Opera Ridge Projects pty ltd",
      "photos": [
        {
          "url": "/assets/construction-progress/20-albert-street-gladesville/01-2026-09-28.webp",
          "date": "2026-09-28",
          "width": 1200,
          "height": 1600,
          "altZh": "施工出入口与 AUD 围挡 · 20 Albert Street · 2026-09-28",
          "altEn": "Site entrance and AUD construction fencing at 20 Albert Street · 2026-09-28",
          "originalSha256": "0aa87de0a14642a75d1c16dba2c87fcec68ec954fda03ba5819ac8114b37c2f6",
          "publicSha256": "4070e0bd3f4f87b4bf88531244451a9d27a9d54e14f5913b5848bcbdc4503980"
        },
        {
          "url": "/assets/construction-progress/20-albert-street-gladesville/02-2026-09-28.webp",
          "date": "2026-09-28",
          "width": 1200,
          "height": 1600,
          "altZh": "场地围挡与临时设施 · 20 Albert Street · 2026-09-28",
          "altEn": "Construction fencing and temporary facilities at 20 Albert Street · 2026-09-28",
          "originalSha256": "f89ff44b156680330f9b77d3ddd30c8dd32eb8666b56e7d783d8927b7d348fc4",
          "publicSha256": "79717fd435135f119b118ee9a78d0039f2729726fff657985b0d1b3cb3ee6484"
        },
        {
          "url": "/assets/construction-progress/20-albert-street-gladesville/03-2026-09-28.webp",
          "date": "2026-09-28",
          "width": 1200,
          "height": 1600,
          "altZh": "从出入口看到的已清理场地 · 20 Albert Street · 2026-09-28",
          "altEn": "Cleared site viewed from the entrance at 20 Albert Street · 2026-09-28",
          "originalSha256": "26d7aa67d9b476fb5130dd4d24d63f65c634cf437b560ca38e0db301175dcf85",
          "publicSha256": "7e3e69075d327f52a13e7203faee9794ecff5a4c1956dd1b28bbfa552ba1a6df"
        },
        {
          "url": "/assets/construction-progress/20-albert-street-gladesville/04-2026-09-25.webp",
          "date": "2026-09-25",
          "width": 1200,
          "height": 1600,
          "altZh": "临时厕所旁的场地 · 20 Albert Street · 2026-09-25",
          "altEn": "Site area beside the temporary toilet at 20 Albert Street · 2026-09-25",
          "originalSha256": "dfb238d91e1e08a62ec172c8c736e5e2431d552ec99c2452c03e76eedf6c6379",
          "publicSha256": "3ad1a75900d5135fe133a293ddf9d8556c0b7fd5c55a32194cae9e22caef01ee"
        },
        {
          "url": "/assets/construction-progress/20-albert-street-gladesville/05-2026-09-25.webp",
          "date": "2026-09-25",
          "width": 1200,
          "height": 1600,
          "altZh": "场地、围挡与临时厕所 · 20 Albert Street · 2026-09-25",
          "altEn": "Cleared site, fencing and temporary toilet at 20 Albert Street · 2026-09-25",
          "originalSha256": "91aea85285c4eca734ede303c70c57cd07a17a9234d056a1ad5ff018e47f4389",
          "publicSha256": "6e4a2546fbfd30a0bafffebb12b20caec37eabdf3065d9c1292a47066a908c58"
        },
        {
          "url": "/assets/construction-progress/20-albert-street-gladesville/06-2026-09-25.webp",
          "date": "2026-09-25",
          "width": 1200,
          "height": 1600,
          "altZh": "已清理场地与围挡 · 20 Albert Street · 2026-09-25",
          "altEn": "Cleared site and fencing at 20 Albert Street · 2026-09-25",
          "originalSha256": "b09a1b7f639ee97561403c5968496fba86299e2c3ccf33847c72e4747ac66cfc",
          "publicSha256": "8bcccb641f69dfa00ba9a3edbe557a2690ff579e08f750c8f4dbc5a4e55b30a0"
        },
        {
          "url": "/assets/construction-progress/20-albert-street-gladesville/07-2026-09-22.webp",
          "date": "2026-09-22",
          "width": 1200,
          "height": 1600,
          "altZh": "临时厕所到场后的现场 · 20 Albert Street · 2026-09-22",
          "altEn": "Temporary toilet on site at 20 Albert Street · 2026-09-22",
          "originalSha256": "f32e66dc4939882ab13186753c9c786ecb36048fe00c16c25005444c94b78221",
          "publicSha256": "3586f0f9bad4ae049a9ce38e50091b7e2e05005485e6203c905554d4ad932bb7"
        },
        {
          "url": "/assets/construction-progress/20-albert-street-gladesville/08-2026-09-22.webp",
          "date": "2026-09-22",
          "width": 1200,
          "height": 1600,
          "altZh": "AUD 施工围挡与出入口 · 20 Albert Street · 2026-09-22",
          "altEn": "AUD fencing and site entrance at 20 Albert Street · 2026-09-22",
          "originalSha256": "e7690fb8ce11e3537416d174261cb3e475a7336091cde86e01df282e66db9a2f",
          "publicSha256": "5595c4c38a843abc923cef57604b72d7aeada360ff9ee0eac59809c95e84d682"
        }
      ],
      "originalReports": [],
      "pmTaskSnapshot": {
        "readOn": "2026-10-01",
        "scope": "Stored PM task rows, often older imports; planned dates, recorded status and actual-finish fields do not constitute inspection or current field verification. Read with the newer dated daily records.",
        "tasks": [
          {
            "name": "OSD和WRT施工",
            "status": "计划中",
            "startDate": null,
            "finishDate": null,
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-30T01:36:32.464Z"
          },
          {
            "name": "一楼拓展楼板浇筑",
            "status": "计划中",
            "startDate": null,
            "finishDate": null,
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-30T01:36:32.464Z"
          },
          {
            "name": "一楼楼板砌砖",
            "status": "计划中",
            "startDate": null,
            "finishDate": null,
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-30T01:36:32.464Z"
          },
          {
            "name": "二楼木架（水泥强度养护）",
            "status": "计划中",
            "startDate": null,
            "finishDate": null,
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-30T01:36:32.464Z"
          },
          {
            "name": "二楼楼面模板钢筋浇水泥",
            "status": "计划中",
            "startDate": null,
            "finishDate": null,
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-30T01:36:32.464Z"
          },
          {
            "name": "二楼砌砖+dincel水泥墙体",
            "status": "计划中",
            "startDate": null,
            "finishDate": null,
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-30T01:36:32.464Z"
          },
          {
            "name": "土方开挖",
            "status": "计划中",
            "startDate": null,
            "finishDate": null,
            "actualFinishDate": "2026-07-22",
            "aiTableSyncedAt": "2026-07-30T01:36:32.464Z"
          },
          {
            "name": "地下室Dincle墙体浇筑",
            "status": "计划中",
            "startDate": null,
            "finishDate": null,
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-30T01:36:32.464Z"
          },
          {
            "name": "地下室底板浇筑",
            "status": "计划中",
            "startDate": null,
            "finishDate": null,
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-30T01:36:32.464Z"
          },
          {
            "name": "地下室顶板浇筑",
            "status": "计划中",
            "startDate": null,
            "finishDate": null,
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-30T01:36:32.464Z"
          },
          {
            "name": "屋顶彩钢瓦",
            "status": "计划中",
            "startDate": null,
            "finishDate": null,
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-30T01:36:32.464Z"
          },
          {
            "name": "开工",
            "status": "已完成",
            "startDate": null,
            "finishDate": "2026-07-29",
            "actualFinishDate": "2026-07-22",
            "aiTableSyncedAt": "2026-07-30T01:36:32.464Z"
          },
          {
            "name": "游泳池施工",
            "status": "计划中",
            "startDate": null,
            "finishDate": null,
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-30T01:36:32.464Z"
          },
          {
            "name": "脚手架搭设",
            "status": "计划中",
            "startDate": null,
            "finishDate": null,
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-30T01:36:32.464Z"
          }
        ]
      },
      "latestDailyRecordSummary": [
        {
          "date": "2026-10-01",
          "zh": "现场人员报告围栏已处理妥当；未附独立签认证据。",
          "en": "Site staff report the fence is in order; no independent sign-off accompanies the statement."
        },
        {
          "date": "2026-09-28",
          "zh": "日报记录工地看护。",
          "en": "The daily record reports site care."
        }
      ]
    },
    {
      "project": "9 Barons Crescent",
      "address": "9 Barons Crescent, Hunters Hill, NSW 2110, Australia",
      "pages": {
        "en": "https://audbuild.com/projects/construction/9-barons-crescent-hunters-hill/",
        "zh": "https://audbuild.com/zh/projects/construction/9-barons-crescent-hunters-hill/"
      },
      "stage": {
        "en": "Demolition and site-access coordination",
        "zh": "拆除与出入口协调"
      },
      "recordReviewDate": "2026-10-01",
      "builderMasterReviewedAt": "2026-09-30",
      "builderAsRecorded": null,
      "photos": [
        {
          "url": "/assets/construction-progress/9-barons-crescent-hunters-hill/01-2026-10-01.webp",
          "date": "2026-10-01",
          "width": 1600,
          "height": 1200,
          "altZh": "挖掘机与拆除中的建筑 · 9 Barons Crescent · 2026-10-01",
          "altEn": "Excavator and partially demolished building at 9 Barons Crescent · 2026-10-01",
          "originalSha256": "2ff0f8cba337fd87fa2f70314003303785ecf39591c13864ca4c9387924a50cd",
          "publicSha256": "51d4c021009658c97b124026e3e08066c6edd1df740d5865c4330044ab892a58"
        },
        {
          "url": "/assets/construction-progress/9-barons-crescent-hunters-hill/02-2026-10-01.webp",
          "date": "2026-10-01",
          "width": 1600,
          "height": 1200,
          "altZh": "拆除中的墙体和建筑构件 · 9 Barons Crescent · 2026-10-01",
          "altEn": "Walls and building components during demolition at 9 Barons Crescent · 2026-10-01",
          "originalSha256": "9d06aba94ce584c2fb736e4db1d63c392bdd7897d43af2d16e264d8232d870df",
          "publicSha256": "34beec697190e2c422c3df2d7f797a9476d085050b745dd4c0ed4887c9ba075e"
        },
        {
          "url": "/assets/construction-progress/9-barons-crescent-hunters-hill/03-2026-10-01.webp",
          "date": "2026-10-01",
          "width": 1600,
          "height": 1200,
          "altZh": "拆除中的砖墙和建筑材料 · 9 Barons Crescent · 2026-10-01",
          "altEn": "Brickwork and construction debris during demolition at 9 Barons Crescent · 2026-10-01",
          "originalSha256": "4ed5d298be497ef35c044deae53a61272ea042b77cb42758de335c98aff80bbc",
          "publicSha256": "ecc412b79fcc093a010dbe355336cc092b5b2f653f4aa7ec4cfa852b581378a4"
        },
        {
          "url": "/assets/construction-progress/9-barons-crescent-hunters-hill/04-2026-10-01.webp",
          "date": "2026-10-01",
          "width": 1600,
          "height": 1200,
          "altZh": "拆除区域的砖块和混凝土 · 9 Barons Crescent · 2026-10-01",
          "altEn": "Brick and concrete debris in the demolition area at 9 Barons Crescent · 2026-10-01",
          "originalSha256": "491641344e3f9396d7a3325ac04b7d43b7caac0beaad0ec1b502cf6bcc861291",
          "publicSha256": "538f9fdc16568363be6b32b8bb766a17a20caf61287eaebe3d45f484430d2637"
        },
        {
          "url": "/assets/construction-progress/9-barons-crescent-hunters-hill/05-2026-10-01.webp",
          "date": "2026-10-01",
          "width": 1600,
          "height": 1200,
          "altZh": "挖掘机、拆除材料和现场车辆 · 9 Barons Crescent · 2026-10-01",
          "altEn": "Excavator, materials and site vehicle at 9 Barons Crescent · 2026-10-01",
          "originalSha256": "18635dde73ce9ead4a791b0a63fbc54e0058539f889c121491c0eb4bb305b1ca",
          "publicSha256": "a2c68cad30895fc75c6e71fa022a791d78491b79a501c4256e6b1d87ccdebff5"
        },
        {
          "url": "/assets/construction-progress/9-barons-crescent-hunters-hill/06-2026-09-30.webp",
          "date": "2026-09-30",
          "width": 1600,
          "height": 1200,
          "altZh": "现场拆除区域 · 9 Barons Crescent · 2026-09-30",
          "altEn": "Site demolition area at 9 Barons Crescent · 2026-09-30",
          "originalSha256": "713545c5f9703dace33dc7aacbb62d075949ce5ce5a67a591d818d1b037e29a0",
          "publicSha256": "9aca5452fc90a0ceefd35a95e4936cd8adecebb0fa0ad26377ab59777c67fe2c"
        },
        {
          "url": "/assets/construction-progress/9-barons-crescent-hunters-hill/07-2026-09-29.webp",
          "date": "2026-09-29",
          "width": 1600,
          "height": 1200,
          "altZh": "挖掘机与正在拆除的墙体 · 9 Barons Crescent · 2026-09-29",
          "altEn": "Excavator and walls during demolition at 9 Barons Crescent · 2026-09-29",
          "originalSha256": "95d5b4b68a9ad81ee5da616f32ca9ecc9bf5bb5ce59a999d15b19cd1b95a45c6",
          "publicSha256": "1a7c00bde6cee1e6055e5edd227d7f18b73bd520fc59c6ebddc6dafd62596232"
        },
        {
          "url": "/assets/construction-progress/9-barons-crescent-hunters-hill/08-2026-09-29.webp",
          "date": "2026-09-29",
          "width": 1600,
          "height": 1200,
          "altZh": "砖墙拆除与现场废料 · 9 Barons Crescent · 2026-09-29",
          "altEn": "Brick demolition and debris at 9 Barons Crescent · 2026-09-29",
          "originalSha256": "783918c48ce4ee5fae20023f278dd0fcde92b50e69364492869f5150195f0db8",
          "publicSha256": "a930c63a96275bae3eb199382047f9f9b96b623c445fb4126a0c66cbad1e2da0"
        }
      ],
      "originalReports": [],
      "pmTaskSnapshot": {
        "readOn": "2026-10-01",
        "scope": "Stored PM task rows, often older imports; planned dates, recorded status and actual-finish fields do not constitute inspection or current field verification. Read with the newer dated daily records.",
        "tasks": [
          {
            "name": "拆房？，道路/验收",
            "status": "已逾期",
            "startDate": "2026-06-19",
            "finishDate": "2026-07-14",
            "actualFinishDate": null,
            "aiTableSyncedAt": "2026-07-26T19:01:35.861Z"
          }
        ]
      },
      "latestDailyRecordSummary": [
        {
          "date": "2026-10-01",
          "zh": "日报记录继续拆除。",
          "en": "The daily record reports demolition continuing."
        },
        {
          "date": "2026-09-30",
          "zh": "故障车辆仍占据出入口，团队持续联系处理。10 月 1 日拆除记录没有明确确认通道问题已关闭。",
          "en": "A broken-down truck remained at the driveway while the team followed up. The 1 October demolition record does not explicitly close out the access problem."
        }
      ]
    }
  ],
  "scope": "Construction-stage and task evidence; no whole-home completion or market-rank conclusion. Two additional 10 College Crescent photographs dated 2026-10-01 document roof-sheet work in progress.",
  "pmTaskSnapshotRecordCount": 167
}