{
  "reviewedAt": "2026-09-30",
  "inConstructionProjects": 10,
  "countSource": "Management confirmation on 30 September 2026, with project-by-project operational record matching",
  "authoredBy": "AUD Build",
  "sourceSystems": [
    "PM audbuild.cn",
    "DingTalk AUD project records"
  ],
  "scope": "Dated first-party operational evidence. Site descriptions, professional inspection findings and completion have their own scopes.",
  "projects": [
    {
      "project": "20 Albert Street",
      "location": "20 Albert Street, Gladesville, NSW 2111, Australia",
      "recordDate": "2026-09-28",
      "summaryZh": "现场看护与巡查记录；照片显示已清理场地、施工围挡及临时设施。",
      "summaryEn": "Site attendance and monitoring records, with a photograph of the cleared site and temporary facilities.",
      "photograph": {
        "url": "https://audbuild.com/assets/project-evidence/20-albert-st-gladesville-site-2026-09-28.jpg",
        "recordDate": "2026-09-28",
        "sha256": "0aa87de0a14642a75d1c16dba2c87fcec68ec954fda03ba5819ac8114b37c2f6",
        "altZh": "20 Albert Street 施工场地、围挡及临时设施。",
        "altEn": "Cleared site, construction fencing and temporary site facilities at 20 Albert Street."
      },
      "sourceType": "First-party PM site records and DingTalk project register",
      "professionalReportBatchIncluded": false
    },
    {
      "project": "10 College Crescent",
      "location": "10 College Crescent, St Ives, NSW 2075, Australia",
      "recordDate": "2026-09-29",
      "summaryZh": "现场清理记录；照片显示砖墙、结构框架、脚手架及现场车辆。",
      "summaryEn": "Site cleaning records, with brickwork, framing, scaffolding and site transport visible in the reviewed photograph.",
      "photograph": {
        "url": "https://audbuild.com/assets/project-evidence/10-college-cres-st-ives-site-2026-09-29.jpg",
        "recordDate": "2026-09-29",
        "sha256": "4a7628693c42affc2ce85a897fa029c5b8013869fe807a6b0020bfaec4ec9b7e",
        "altZh": "10 College Crescent 砖墙、结构框架、脚手架及现场车辆。",
        "altEn": "Brickwork, structural framing, scaffolding and a site vehicle at 10 College Crescent."
      },
      "sourceType": "First-party PM site records and DingTalk project register",
      "professionalReportBatchIncluded": true
    },
    {
      "project": "6 College Crescent",
      "location": "6 College Crescent, St Ives, NSW 2075, Australia",
      "recordDate": "2026-09-29",
      "summaryZh": "砌砖与场地清理；另有8月Dincel浇筑连续日报、任务历史及服务协议。",
      "summaryEn": "Brickwork and site cleaning, supported by the August Dincel pour sequence, task history and preserved project agreement.",
      "photograph": {
        "url": "https://audbuild.com/assets/project-evidence/6-college-cres-st-ives-site-2026-09-29.jpg",
        "recordDate": "2026-09-29",
        "sha256": "99ff7e6468eb8c6c40709f0933b614655451b60d7ed20beb31b7f9bd765bb89e",
        "altZh": "6 College Crescent 砌筑墙体、现场材料及地下室开口。",
        "altEn": "Brick walls, materials and the basement opening at 6 College Crescent."
      },
      "sourceType": "First-party PM site records and DingTalk project register",
      "professionalReportBatchIncluded": true
    },
    {
      "project": "14 Wolsten Avenue",
      "location": "14 Wolsten Avenue, Turramurra, NSW 2074, Australia",
      "recordDate": "2026-09-29",
      "summaryZh": "木工现场作业记录；另有窗安装日报、材料招采记录；照片显示外墙及脚手架。",
      "summaryEn": "Site carpentry records, earlier window-installation reporting and a project materials procurement record.",
      "photograph": {
        "url": "https://audbuild.com/assets/project-evidence/14-wolsten-ave-turramurra-site-2026-09-29.jpg",
        "recordDate": "2026-09-29",
        "sha256": "4fdea88d12573b606fad403c0a44a314eefea59d5a8ad8e3d2e018749a7fec26",
        "altZh": "14 Wolsten Avenue 外墙、脚手架及现场材料。",
        "altEn": "Building exterior, scaffolding and stored materials at 14 Wolsten Avenue."
      },
      "sourceType": "First-party PM site records and DingTalk project register",
      "professionalReportBatchIncluded": true
    },
    {
      "project": "1 Toolang Road",
      "location": "1 Toolang Road, St Ives, NSW 2075, Australia",
      "recordDate": "2026-09-28",
      "summaryZh": "现场抹灰相关语音记录；照片显示外墙作业、门窗保护及脚手架。",
      "summaryEn": "Site rendering-related reporting, with exterior work, window protection and scaffolding visible in the photograph.",
      "photograph": {
        "url": "https://audbuild.com/assets/project-evidence/1-toolang-rd-st-ives-site-2026-09-28.jpg",
        "recordDate": "2026-09-28",
        "sha256": "3f5b0dd4ea171d5309cb008638194c88b48de981f508175056ff6ea481d358bc",
        "altZh": "1 Toolang Road 外墙作业、门窗保护及脚手架。",
        "altEn": "Exterior wall work, protected windows and scaffolding at 1 Toolang Road."
      },
      "sourceType": "First-party PM site records and DingTalk project register",
      "professionalReportBatchIncluded": true
    },
    {
      "project": "12 Lennox Street",
      "location": "12 Lennox Street, Gordon, NSW 2072, Australia",
      "recordDate": "2026-09-28",
      "summaryZh": "Dincel墙浇筑记录；照片显示混凝土泵车、搅拌车及工地设备。",
      "summaryEn": "Dincel wall concreting reporting, with a concrete pump and mixer truck in the site photograph.",
      "photograph": {
        "url": "https://audbuild.com/assets/project-evidence/12-lennox-st-gordon-site-2026-09-28.jpg",
        "recordDate": "2026-09-28",
        "sha256": "519b31d3cc641a0709ffe35dca26559527aebf3e76c0d60bd7add0d8a38d7426",
        "altZh": "12 Lennox Street 混凝土泵车、搅拌车及工地设备。",
        "altEn": "Concrete pump, mixer truck and site equipment at 12 Lennox Street."
      },
      "sourceType": "First-party PM site records and DingTalk project register",
      "professionalReportBatchIncluded": true
    },
    {
      "project": "75 Cutler Road",
      "location": "75 Cutler Road, Clontarf, NSW 2093, Australia",
      "recordDate": "2026-09-29",
      "summaryZh": "抽水与混凝土施工准备记录；照片显示配筋、模板及管线。",
      "summaryEn": "Water removal and concrete preparation records, with reinforcement, formwork and pipework visible in the photograph.",
      "photograph": {
        "url": "https://audbuild.com/assets/project-evidence/75-cutler-rd-clontarf-site-2026-09-29.jpg",
        "recordDate": "2026-09-29",
        "sha256": "c53842db86863f8a7d71f238745e4b08f6560e5acdfbc3629bbddf4ee8dc096b",
        "altZh": "75 Cutler Road 现场配筋、模板及管线。",
        "altEn": "Reinforcement, formwork and pipework in the 75 Cutler Road site photograph."
      },
      "sourceType": "First-party PM site records and DingTalk project register",
      "professionalReportBatchIncluded": false
    },
    {
      "project": "3 Amesbury Avenue",
      "location": "3 Amesbury Avenue, St Ives, NSW 2075, Australia",
      "recordDate": "2026-09-29",
      "summaryZh": "拆除进行中；日报记录后续测量与开挖衔接；照片显示挖机和拆除材料。",
      "summaryEn": "Demolition reporting and planned survey/excavation sequencing, with an excavator and demolition material visible.",
      "photograph": {
        "url": "https://audbuild.com/assets/project-evidence/3-amesbury-ave-st-ives-site-2026-09-29.jpg",
        "recordDate": "2026-09-29",
        "sha256": "76d69925a532aaeed0eb908911b26110c13f45b190a0b83f70f849cb8b45f689",
        "altZh": "3 Amesbury Avenue 挖掘机及拆除材料。",
        "altEn": "Excavator and demolition debris at 3 Amesbury Avenue."
      },
      "sourceType": "First-party PM site records and DingTalk project register",
      "professionalReportBatchIncluded": false
    },
    {
      "project": "9 Barons Crescent",
      "location": "9 Barons Crescent, Hunters Hill, NSW 2110, Australia",
      "recordDate": "2026-09-29",
      "summaryZh": "拆除、现场电箱设置及出入口堵塞处理记录；照片显示挖机与正在拆除的建筑。",
      "summaryEn": "Demolition, site power and access-obstruction reporting, including the effect of a broken vehicle on material removal.",
      "photograph": {
        "url": "https://audbuild.com/assets/project-evidence/9-barons-cres-hunters-hill-site-2026-09-29.jpg",
        "recordDate": "2026-09-29",
        "sha256": "95d5b4b68a9ad81ee5da616f32ca9ecc9bf5bb5ce59a999d15b19cd1b95a45c6",
        "altZh": "9 Barons Crescent 挖掘机、拆除中的建筑及废料。",
        "altEn": "Excavator, partially demolished structure and debris at 9 Barons Crescent."
      },
      "sourceType": "First-party PM site records and DingTalk project register",
      "professionalReportBatchIncluded": false
    },
    {
      "project": "306 Pittwater Road",
      "location": "306 Pittwater Road, East Ryde, NSW 2113, Australia",
      "recordDate": "2026-09-28",
      "summaryZh": "9月26日记录Dincel到货，9月28日现场协调；有拆除采购比选原表和报价。照片显示场地土方及通道。",
      "summaryEn": "Dincel material-arrival reporting and site coordination, alongside a preserved demolition supplier comparison and quotation.",
      "photograph": {
        "url": "https://audbuild.com/assets/project-evidence/306-pittwater-rd-east-ryde-site-2026-09-26.jpg",
        "recordDate": "2026-09-26",
        "sha256": "4d8d948684b362817d8d4fab8ee86d54848582792ee68503c0a99d7fc5526289",
        "altZh": "306 Pittwater Road 场地土方及通道。",
        "altEn": "Earthworks area and access path in the 306 Pittwater Road site photograph."
      },
      "sourceType": "First-party PM site records and DingTalk project register",
      "professionalReportBatchIncluded": false
    }
  ]
}