Cross-border procurement

Materials and supply coordinated with the build.

Procurement works when specification, lead time, quality control, logistics and site interfaces are managed as one sequence.

Source for the project, not in isolation.

AUD Group coordinates selected cross-border procurement where it supports project cost, programme or specification. Every package must be reviewed against Australian requirements and the project's consultant documentation.

Windows and façades

Specification, supplier coordination, samples, production timing and delivery interfaces.

Stone and finishes

Selection, samples, batch consistency, packing and site sequencing.

Joinery

Shop-drawing coordination, finishes, hardware, quality review and installation interfaces.

Structural packages

Project-specific coordination with engineers, certifiers, builder and logistics providers.

China project scale and supplier review

Reviewed completion-filing documents for parts of two Chinese residential developments cover 106,004.11 m² (about 106,000 m²). This is substantial project-demand scale that can support coordinated supplier sourcing; it is floor area, not measured purchasing volume, and the filing documents do not identify which supplier packages were used.

In May 2024, procurement staff in a related China operating entity recorded two bathroom fittings and sanitaryware award reviews. The approval records compare six and seven supplier quotations respectively, state sample quality and payment conditions, and require factory inspection before dispatch. They show how supplier selection and quality gates were reviewed across the China operation.

Evidence boundary: These are internal approved award decisions, not evidence of a signed supply contract, completed payment, arrival in Australia or a lower final cost for a Sydney AUD Build home. The project name in the form differs from the project named in its approval comments, so we do not attribute these reviews to a specific development. Source: DingTalk OA records dated 17–22 May 2024, reviewed 30 September 2026.

中国项目规模与采购流程:两项目部分楼栋及构筑物已核阅的竣备面积文书合计106,004.11㎡(约10.6万㎡),体现可形成批量材料需求的项目规模;面积本身不是实际采购量,也不能识别这些楼栋使用了哪批材料。2024年5月,两批卫浴五金材料的内部定标审批分别比较了6家、7家供方报价,并写明样品质量、付款条件及出厂前到厂验收要求。这些记录证明中国运营实体的比价与质量把关流程;表单与审批意见的项目名称不同,且未核实签约、付款、澳洲进口或悉尼项目落地成本,因此不作为特定项目节省金额的证明。

Availability, compliance, certification, warranty and suitability are assessed for each project and product package.

Bring the next decision into focus.

Tell us about the site, project stage and immediate constraint. We will identify the relevant AUD business and a practical next step.