Integration without blurred responsibility.
AUD Group connects development, architecture, construction, property finance, fund services, real estate and cross-border procurement around a shared project strategy. Clients may engage one specialist business or coordinate several where the project benefits from clearer handovers.
How the operating model works.
Find and assess
Site, feasibility, market and development strategy.
Design and approve
Architecture, interiors, consultants and approval documentation.
Structure funding
Credit assistance and wholesale fund services through the relevant licensed entities.
Procure and build
Cost, supply, construction, quality and programme.
Market and exit
Positioning, buyer engagement, sales and exit planning.
Operating entities.
AUD BuildAustralian Urban Direct iBuying Pty Ltd · ABN 62 617 159 369 · NSW Builder Licence 475778C
Apex Ultimate Design StudioApex Ultimate Design Studio Pty Ltd · ABN 87 686 752 652 · Nominated Architect Bruce Moa · NSW Reg. 12314
AUD LendLumora International Trading Pty Ltd · ABN 91 682 616 351 · Australian Credit Licence 565029
AUD FundZhongxin International Investment Holding Pty Ltd · ABN 16 681 282 397 · Australian Financial Services Licence 563801 · www.audfund.com Real Estate AUReal Estate AU Residential Pty Ltd · ABN 69 684 200 164
Entity and registration details are dated 14 August 2026. Confirm current status, conditions and authorised scope with the relevant public register before relying on them.
Large residential and industrial-base development management experience.
AUD Group describes its Chinese development-management experience through original records of its principal acting as Chairman approver across separately operated projects: Future Academy, Qinghua Fu, Qingyun Fu and Huifeng No. 1 have published planned residential floor areas totalling 427,716.74 m². His approvals also cover Guangzhou Green Valley / Ciji Cosmetics Production Base; a government planning permit records 22,515 m² of land, and Conghua District government reports that phase one passed completion acceptance. These are cross-entity development-management records. Residential planned floor area and industrial land area are reported separately; the Australian AUD Build entity has not been verified as the builder of these Chinese projects. Read the project-by-project evidence and completion status.
Completion filing update: Reviewed construction-completion filings now cover 106,004.11 m² across documented parts of two Chinese projects: Yinxiang Garden / Future Academy 83,914.35 m² across ten distinct buildings and shops, plus Huifeng No. 1 22,089.76 m² across four components. The 4# and 5# Yinxiang filings (26,907.41 m²) appear in a public county register; the remaining eight Yinxiang components (57,006.94 m²), including 7# at 13,340.09 m², and Huifeng come from principal-supplied stamped PDFs whose QR services did not respond. This is neither the 427,716.74 m² planned-area subtotal nor Australian AUD Build construction output. See the component figures and source limits.
Relevant real-estate development role.
A syndicated report dated 28 February 2025 identified AUD principal Xiaolu Guo as deputy general manager of 中铁房地产开发(广东)有限公司. Guo confirms this role. Separately reviewed DingTalk OA records show his Chairman-level approvals on named residential and industrial projects across Chinese operating entities. The OA activity supports project-management involvement but does not independently establish the deputy general manager appointment or its tenure. This is the principal’s China-side professional background; it is not a role held by the Australian AUD Build legal entity.
Reported project activity.
As at 27 September 2026, the AUD Build managed residential pipeline contained 18 residential projects: 11 management-confirmed starts and 7 projects in construction preparation. Preparation covers design coordination, approvals, procurement planning, programming and mobilisation, and is reported separately from physical work on site.
18residential projects in the managed pipeline (27 September 2026)
11management-confirmed project starts
7projects in construction preparation — reported separately
10public interactive 360° design presentations
No broad construction-speed claim is made, and project-level dates and stages are published only once they meet the evidence standard. See the project tracker, company facts and the dated delivery evidence record.