Sydney residential projects · Dated site records

75 Cutler Road, Clontarf · Construction progress and project evidence

Concrete and interior trade records

75 Cutler Road, Clontarf, NSW 2093, Australia
Reviewed: 1 October 2026 AEST · Stages reflect their dated source records

Recorded workConcrete and interior trade records
Published site photos8
Original report indexPending

Project rolesProgressSite photosInspectionsRectification

Project roles and responsibility

The project master reviewed on 30 September 2026 names Australian Urban Direct iBuying Pty Ltd in the Builder field. This page presents project coordination, stage records and document management within the AUD operating framework. The master field is a project record; the contract, licence and appointment documents determine construction responsibility.

Projects use their respective responsible entities. The shared management system shows operating coordination; corporate relationships and responsibility are checked against the relevant documents.

Dated construction progress

  1. Pumping and preparation for concrete work recorded.

  2. Reports first describe concrete placement in progress, then report the pour complete and an issue resolved; these are site-personnel statements.

  3. Plumbing and plasterboard activity recorded; photographs show the interior work area and materials.

Photographs from the site

Dates come from the linked PM site record. Photographs show visible work and do not independently certify concealed work or inspection outcomes. Public images have EXIF/GPS metadata removed; originals and hashes are retained in the dossier.

Professional inspection report index

No original professional inspection report for this address is currently in this page’s dossier. Site progress, demolition tasks and scheme meetings are not professional acceptance findings.

Rectification and stage acceptance records

Management has confirmed stage acceptance and related rectification for completed work. This page does not yet have matching professional check/reinspection originals; progress photographs do not establish professional clearance.

Site issue: personnel reported the pour complete and the issue resolved on 30 September. This is a site statement, not an independent professional reinspection record.

Project award announcement

WLRD’s 2026 announcement names AUD Build as the Best Luxury Residence Award recipient for 75 Cutler Road, Clontarf. Management confirms the project remains under construction; the award announcement is separate from stage inspections and handover evidence.

WLRD award announcement · Award source and organisation relationship record

Sources and next steps

This page uses a read-only PM snapshot, the project master/construction task tables reviewed on 30 September 2026, and user-supplied inspection originals whose pages were reviewed. Management records and professional reports are identified separately; photographs were checked for project linkage and visible content.

Next: pair each work stage with its check, before/after rectification photographs and sign-off documents, then add stage-acceptance and whole-home handover records as obtained.

Explore all 11 project dossiers · Public evidence index

Bring your plans into the discussion

Choosing a custom-home or knockdown-rebuild builder? Share the site, drawings, approval status and material specification to discuss roles, work stages, quote inclusions and available site visits.

Discuss your build

Explore custom home construction · Compare builders on the same criteria

PM work schedules and site progress

Read-only extract on 1 October 2026. The table shows stored status, planned dates, actual-finish fields and the last sync date. Some imports predate the site diaries and are historical schedule snapshots. Status and actual-finish fields can differ; blanks remain blank. Planned dates do not establish completed construction or acceptance. Newer master records, professional inspections and signed close-outs are checked separately.

Recent site-record summaries

  1. — The daily record reports plumbing and plasterboard activity.
  2. — Site staff report an issue resolved and concreting finished; this brief record has no item-by-item professional close-out document.
Open 13 stored PM schedule records, including older imports
Original task titleStored statusPlanned startPlanned finishActual-finish fieldLast sync
室内装修拆除Recorded complete2025-08-032025-10-222025-10-222026-07-31
水电、煤气、空调管线In progress2026-07-262026-08-12—2026-07-31
电梯施工In progress2026-07-262026-09-22—2026-07-31
车库/连廊土建结构Not started2026-08-142026-09-14—2026-07-31
OC验收Planned———2026-07-31
外立面施工Planned———2026-07-31
室内乳胶漆Planned———2026-07-31
室内地板Planned———2026-07-31
室内结构拆改与加固Planned———2026-07-31
室内防水及瓷砖Planned———2026-07-31
室外园林(园建、绿化)Planned———2026-07-31
柜体、卫浴、灯具安装Planned———2026-07-31
楼梯/阳台拦杆、扶手Planned———2026-07-31

Request a site visit and document review — Subject to owner consent, site safety, work in progress and a confirmed time; a request is not a confirmed appointment.