One group, connected responsibilities

China operations

Guangzhou Guotie Investment Group (广州国铁投资集团) is AUD's China operating company. Guangdong Yunji (广东云极供应链管理有限公司) is its China procurement and trading company.

Manufacturing and warehousing

The AUD China–Australia Cross-Border Industrial Park is used to organise factory manufacturing and warehousing. AUD's chairman confirmed that RMB 500 million had already been invested as of 21 October 2026.

Australian materials

NATURALWELL AUSTRALIA PTY LTD is an AUD Group materials business. It is named in the reviewed Australian import workflow.

Online material selection

AUD Materials, also presented as AUD Build Materials, is AUD's one-stop builder procurement platform at audbuild.net. It connects online material selection with the group's China procurement and Australian project capabilities. Its live catalogue and China factory-direct channel were accessed on 21 October 2026.

Entity relationships and the park investment are company-confirmed information. Internal procurement and import documents provide examples of the operating roles; they are not independent verification of the investment amount.

Specific material choices within shared purchasing

A coordinated October 2026 wall-panel purchase recorded individual selections for four Australian homes. The dimensions below describe the procurement schedule; they are not installed-area measurements.

Grey bathroom wall panels

Two project selections: 900 × 1800 mm format, 12 mm thickness and a soft finish.

White patterned bathroom panels

One project selection: 900 × 1800 mm format, 9 mm thickness and a matt finish.

Soft white bathroom panels

One project selection: 750 × 1500 mm format, 10 mm thickness and a soft finish.

Lighting and measured entry doors

A lighting contract covers the same four-project programme. A separate entry-door workflow records project measurements and batch production requirements for two homes.

Source basis: October 2026 material schedule and contract approval records, including the wall-panel quotation dated 17 October and entry-door cost review dated 21 October. Material use across the four projects was confirmed by AUD's chairman.

Examples from the procurement and logistics workflow

  1. Project schedules specify material format, thickness, finish and intended room. Combining orders retains each home's individual choices.

  2. The wall-panel contract received the chairman's approval. A lighting contract is shown as approved. A separate entry-door production payment request remained in processing when reviewed. These records demonstrate purchasing coordination; a payment request is not a payment receipt.

  3. An October tile-handling record describes changing from a smaller to a larger container and arranging manual loading assistance. This is a separate handling example, not the loading record for the window installation described below.

  4. An approved freight-forwarding cooperation record sets out the export service relationship. August project correspondence identifies a Guangdong window manufacturer's delivery to Nansha Port and AUD's responsibility for onward freight for two homes.

  5. A July–August mixed-material import workflow names NATURALWELL AUSTRALIA PTY LTD and describes aluminium windows and doors, lighting components and GRC moulds on a Nansha-to-Sydney shipment. It records the vessel, container, bills of lading and Australian import-tax and processing categories. The identifying references and amounts are retained privately.

  6. AUD confirms that China-sourced materials have been used across the four featured homes, and that the Guangdong-manufactured window and door package is installed at the Clontarf home. This describes the window and door package, not completion of the entire house.

These are separate, real examples of AUD's supply-chain work. The mixed-material shipment has not been linked to the Clontarf window order in this public summary. The import payment request was still in its approval workflow when read; it does not establish payment, customs release or site receipt. Installation completion is a company-confirmed project result.

Source register, without commercial prices

Material schedules and procurement

Internal wall-panel contract and quotation, lighting approval and entry-door workflow. Period: October 2026. Supports material specification, grouped purchasing and project-specific production coordination.

Loading and freight organisation

Internal tile-loading record and freight-forwarding cooperation approval. Period: June–October 2026. Supports container-handling coordination and a defined logistics service relationship.

Project freight responsibilities

Project procurement correspondence dated 10 August 2026. Supports supplier-to-port and AUD onward-freight responsibilities for two window packages.

Australian import workflow

Internal customs disbursement request referring to a 28 July 2026 invoice. Supports the named Australian materials entity, route, cargo categories and import-cost categories. The linked PDF itself was not included in the public source set.

Company statements and photographs

Chairman statements received 21 October 2026 cover group relationships, the park investment, material use and the completed window installation. Three park exterior photographs were supplied; they show exterior buildings and do not verify capacity or investment value. They are not reproduced here.

Live materials catalogue

AUD Build Materials was accessed on 21 October 2026. Visible material categories and the factory-direct channel support the online selection example. Availability and order terms depend on the product.

Related businesses, published credentials and project roles

AUD's company leadership identifies these businesses as supporting AUD Build's core construction capability. The references below identify the relevant services; they are separate from the confidential procurement records.

AUD Build

Residential construction is the core: translating the design, material package and programme into the home being built.

Australian Urban Direct iBuying Pty Ltd · NSW Builder Licence 475778C

AUD Design

Architectural and interior design, documentation and approval coordination connect the brief with material selections and buildability.

Apex Ultimate Design Studio Pty Ltd · NSW architect registration reference 12314 (individual registration)

AUD Materials

The one-stop builder procurement platform connects online selection with China factory purchasing and project supply coordination.

Also presented as AUD Build Materials · ABN 62 617 159 369 (business identifier)

AUD Group

Property development and group coordination bring project feasibility, specialist teams and delivery planning together around AUD Build.

Group and development platform · service entity identified in each engagement

AUD Lend

Construction and home-finance assistance helps align the building contract, approved plans and progress-payment requirements.

Lumora International Trading Pty Ltd · Australian Credit Licence 565029

AUD Fund

Property investment and capital coordination can support eligible development projects through their own funding and offer structures.

Zhongxin International Investment Holding Pty Ltd · AFSL 563801 · wholesale clients only

Real Estate AU

Buying, sales and property-management expertise connects site choice, the intended home and its eventual sale or leasing requirements.

Real Estate AU Residential Pty Ltd · NSW real estate agency licence 10147202

Brand roles and references supplied by AUD on 21 October 2026. The Australian Business Register associates ABN 62 617 159 369 with Australian Urban Direct iBuying Pty Ltd. That ABN is a business identifier, not a materials licence. NATURALWELL AUSTRALIA PTY LTD is separately identified in the import-workflow example above.

Published references were cross-checked against AUD Build company facts, AUD Lend's entity and licence disclosures and AUD Fund's disclosure. The architect reference is an individual's registration, not a company licence; the architect and appointment are identified in the design engagement. These are attributed public references, not a new live-status verification of every regulatory register. Current scope and status can be checked through NSW Verify Licence, NSW Architects Registration Board and ASIC's professional registers.

Explore the homes

What this means for quality and value

AUD combines factory procurement, defined material selections and organised supply to help customers choose quality building materials with strong value. A meaningful comparison considers the same specification and quantity, plus freight, import costs, handling, installation and warranty scope.

This page publishes no supplier prices, payment amounts, commercial terms, private approval identifiers, bank details or original approval attachments. It makes no blanket savings-percentage claim. The RMB 500 million park investment is a separately authorised company statement.