Free tool · renovate or rebuild
Renovate or knock down and rebuild? Cost calculator for Sydney (2026)
Compare the all-in cost of renovating your house, with or without an extension or second storey, against knocking it down and building new. Every rate comes from a published, dated 2026 source; the rebuild side uses the same rates as AUD Build’s knockdown rebuild calculator.
Short answer
A renovation usually costs less in total than a knockdown rebuild, but a major structural renovation with an extension or second storey can come close [7]. With this calculator, a mid-range renovation of a 180 m² house comes to about A$128k–A$257k, against about A$473k–A$786k to knock it down and rebuild the same size with a year’s rent: about 31% of the rebuild. A substantial renovation with a 40 m² extension comes to about 59% of a 220 m² custom rebuild. Some Sydney builders and quantity surveyors treat about 60–70% of the rebuild cost as the point where rebuilding starts to make more sense; it is a rule of thumb, not a standard [7] [8].
Calculate your estimate
Your estimate
Renovation
| Item | Range |
|---|
Knockdown rebuild
| Item | Range |
|---|
Worked examples
| Scenario | Renovation | Knockdown rebuild | Renovation as % of rebuild |
|---|---|---|---|
| 180 m² house, mid-range renovation (CDC), asbestos, stay at home · or rebuild 180 m² project-spec in Western Sydney (CDC), 52 weeks’ rent at A$800 | A$128k–A$257k | A$473k–A$786k | 31% |
| 180 m² house, substantial renovation plus 40 m² ground-floor extension (DA), asbestos, kitchen moved, 13 weeks out · or rebuild 220 m² custom mid-range in Western Sydney (DA), 52 weeks’ rent | A$351k–A$703k | A$682k–A$1.09m | 59% |
| North Shore 200 m² house, mid-range renovation plus 100 m² second storey (DA), asbestos, 26 weeks out at A$1,400 · or rebuild 300 m² custom mid-range on a sloping block (DA), 52 weeks at A$1,400 | A$465k–A$789k | A$1.32m–A$1.79m | 40% |
Rates and allowances used
| Item | Range used | Basis | Source |
|---|---|---|---|
| Renovation of the existing house (floor area × scope rate) · Cosmetic (paint, floors, fixtures) | A$175–375/m² | Buildana’s A$35k–75k for a 200 m² house ÷ 200 | [1] |
| Renovation of the existing house (floor area × scope rate) · Mid-range (kitchen, bathrooms, flooring, paint, minor structural) | A$675–1,225/m² | Buildana’s A$135k–245k for a 200 m² house ÷ 200 | [1] |
| Renovation of the existing house (floor area × scope rate) · Substantial (new wet areas, structural alterations, rewiring, replumbing) | A$1,225–2,425/m² | Buildana’s A$245k–485k for a 200 m² house ÷ 200 | [1] |
| Ground-floor extension (new m² × rate) | A$2,500–4,500/m² | Basic to premium extensions | [2] |
| Second-storey addition (new m² × rate) | A$2,800–4,500/m² | Basic to premium; Pearson gives A$3,000–4,500 | [3] [4] |
| Approval: CDC | A$2k–6k | Renovation A$2k–5k; second storey A$3k–6k | [1] [4] |
| Approval: DA | A$3k–15k | Renovation A$3k–12k; second storey A$6k–15k | [1] [4] |
| Structural assessment and engineering | A$2k–5k | Substantial scope, extension or second storey | [1] |
| Asbestos testing and removal | A$3k–28k | From one room to a whole house | [1] [12] |
| Moving a kitchen or bathroom (plumbing and electrical) | A$8k–20k | If a wet area moves | [1] |
| HBC insurance (icare base rate 1.111% for work to an existing dwelling) | 1.111% | Code H04, metro, including GST and stamp duty | [9] [11] |
| Long service levy (0.25% of works, if A$250,000 or more) | 0.25% | Works of A$250,000 or more | [10] |
| Renovation contingency | 10–15% | Shown separately | [5] [6] |
| Knockdown rebuild side | — | Same rates as the knockdown rebuild calculator; contingency 5–15% | [12] |
How the estimate is built
- Renovation = existing floor area × a scope rate, plus any extension or second storey × its per-m² range. The scope rates divide Buildana’s May 2026 ranges for a typical 200 m² house by 200; they are Western Sydney builder figures, and North Shore jobs often cost more (Pearson gives A$200,000–A$600,000 for a standard 3–4 bedroom whole-house renovation in the Hills and North Shore).
- Approvals, structural assessment, asbestos, moving wet areas, HBC insurance and the long service levy are added from their published ranges. HBC uses icare’s rate for work to an existing dwelling; the levy applies only when the works reach A$250,000.
- The rebuild side is the knockdown rebuild calculator: new floor area × rate, demolition, services, reports, design, approval, site works, external works, council contributions, the levy, HBC and rent.
- The percentage compares the middle of each all-in range, before contingency. Renovation contingency is 10–15% (Pearson, MNA); rebuild contingency is 5–15%.
- Not included: land, transfer duty (neither option triggers it on land you already own), pools, furniture, loan costs and changes in value. Design fees for a renovation are not itemised in the published ranges; ask whether each quote includes them.
Questions
Is it cheaper to renovate or knock down and rebuild in Sydney?
Usually renovating, in total cost. A rebuild can look similar per m², but demolition, a full new home and rent make the whole project dearer. A major structural renovation with an extension or second storey can approach the cost of a rebuild.
At what point does rebuilding make more sense than renovating?
Some Sydney builders and quantity surveyors use about 60–70% of the rebuild cost as a crossover: CPP Quantity Surveyors says about 60%, and Buildana’s calculator uses 60–65%. It is a rule of thumb, not a standard; the condition of the structure, heritage controls and what each option gives you matter as much.
Can I knock down a house in a heritage conservation area?
Not as complying development. In a heritage conservation area a CDC can only demolish minor parts, such as walls not facing the main road, outbuildings and internal elements, so demolishing the whole house needs development consent from council.
Does a renovation need BASIX?
Yes, if the alterations and additions are valued at A$50,000 or more. Renovations have minimum requirements rather than set energy and water targets; a new home must meet the full BASIX standards, including an average of 7 NatHERS stars.
How accurate is this calculator?
It gives a budgeting range for comparing two options, not a quote. Ask for a structural assessment of the existing house before you choose; hidden defects change the renovation figure most.
Sources (all read 28 October 2026)
- Buildana, Home Renovation Cost Sydney 2026, May 2026 refresh (Western Sydney)
- Buildana, Home Extension Cost Sydney 2026 (updated September 2026)
- Buildana, Second Storey Addition Cost Sydney 2026 (8 April 2026)
- Pearson Industries, Second Storey Addition Cost Sydney 2026 (16 May 2026)
- Pearson Industries, Home Renovation Cost Sydney 2026: room by room (23 May 2026)
- MNA Construction, Renovation in Sydney: 2026 guide (4 March 2026)
- CPP Quantity Surveyors, Renovate or knock down and rebuild? A 2026 guide for Sydney homeowners (19 June 2026)
- Buildana, Renovation vs Knockdown Rebuild Calculator (data updated May 2026)
- icare, HBCF premium rates (effective 1 November 2025)
- NSW Government, Long service levy (updated 15 June 2026)
- NSW Government, Insurance cover for building work (updated 6 July 2026)
- AUD Build, Knockdown rebuild cost in Sydney (figures reviewed 26 October 2026)
- NSW DPHI, Exempt development (updated 23 October 2026)
- NSW Planning Portal, Housing Code (updated 14 September 2022)
- NSW DPHI, Demolition of buildings (updated 23 March 2026)