Free tool · duplex and dual occupancy

Duplex cost calculator for Sydney (2026)

Estimate the all-in cost of knocking down a house and building a duplex in Sydney. Every rate and allowance comes from the published ranges in AUD Build’s 2026 duplex cost guide, with sources and dates.

Short answer

Building a duplex in Sydney costs about A$700,000 to A$1.8 million for construction of both homes, excluding land. With this calculator, a 2 × 150 m² standard duplex on a CDC comes to about A$890k–A$1.32m all-in, or about A$946k–A$1.43m with Torrens subdivision and a year’s rent at A$800 a week; a 2 × 200 m² mid-range architectural duplex on a sloping block through a DA, with stormwater detention and subdivision, comes to about A$1.50m–A$2.16m. The calculator includes the state Housing and Productivity Contribution, the Sydney Water charge and the long service levy, which most builder guides leave out.

Calculate your estimate

Site and plans

Median weekly house rents, April–June 2026: Greater Sydney A$800, Blacktown A$700, The Hills A$900, Hornsby A$975, Ku-ring-gai A$1,400.

Your estimate

ItemRange

Worked examples

ScenarioAll-in rangePlus 5–15% contingency
2 × 150 m² standard duplex, CDC, asbestos allowance, no subdivision, no rentA$890k–A$1.32mA$934k–A$1.52m
2 × 150 m² standard duplex, CDC, asbestos allowance, Torrens subdivision, 52 weeks’ rent at A$800 (Greater Sydney median)A$946k–A$1.43mA$992k–A$1.63m
2 × 200 m² mid-range architectural duplex, DA, sloping block with OSD, asbestos allowance, Torrens subdivision, no rentA$1.50m–A$2.16mA$1.57m–A$2.48m

Rates and allowances used

ItemRange usedWhen it applies
New home construction (floor area × rate) · StandardA$2,500–3,200/m²Always
New home construction (floor area × rate) · Mid-range architecturalA$3,200–4,000/m²Always
New home construction (floor area × rate) · Luxury or customA$4,000–5,000/m²Always
Demolition of the existing houseA$10k–A$50kAlways
Asbestos removalA$5k–A$25kIf asbestos is present
Detail survey and geotechnical reportA$4k–A$8kAlways
Architectural design and documentationA$8k–A$50kAlways
Structural engineeringA$3k–A$6kAlways
BASIX and NatHERS assessmentA$1k–A$3kAlways
Approval: CDCA$2k–A$5kCDC route
Approval: DAA$5k–A$15kDA route
Council contributions (one additional dwelling)A$18k–A$55kAlways
Housing and Productivity Contribution (one new dwelling)A$11kAlways
Sydney Water contribution (Sydney Water example)A$3kAlways
Engineered footings on reactive clay (two homes)A$24k–A$44kReactive clay
Sloping site: cut, fill and retainingA$40k–A$90kSloping block
On-site stormwater detentionA$10k–A$25kIf council requires OSD
Service connections for the second homeA$5k–A$15kAlways
External works for two homesA$60k–A$120kAlways
Torrens title subdivisionA$15k–A$60kIf you subdivide
Long service levy (0.25% of construction)0.25%Always
HBC insurance (about 1.16% of construction)1.158%Always

How the estimate is built

  • Construction = total floor area of both homes × the per-m² range for the specification, from Provincial Homes’ published Sydney duplex ranges: A$2,500–3,200 standard, A$3,200–4,000 mid-range architectural, A$4,000–5,000 luxury.
  • Every other item uses the low and high ends of the published ranges in the duplex cost guide. Council contributions are shown for one additional dwelling (A$18,000–A$55,000 as builders quote it); some councils charge per dwelling, so ask yours.
  • The Housing and Productivity Contribution is about A$10,812 for one net new dwelling in Greater Sydney (1 January 2026 rate), and the Sydney Water charge uses Sydney Water’s worked example of about A$2,950.
  • The long service levy is 0.25% of construction; HBC insurance uses icare’s metro base rate of about 1.16%. Rent is weeks × weekly rent. Contingency of 5–15% is shown separately.
  • Not included: land, pools, furniture, loan costs, sales or leasing costs and price changes after October 2026. Check whether each quote includes GST.

Questions

How much does it cost to build a duplex in Sydney in 2026?

About A$700,000 to A$1.8 million for construction of both homes, excluding land, according to the published guides compiled in AUD Build’s 2026 duplex cost guide. All-in budgets for a typical 2 × 150 m² knockdown duplex run about A$0.9–1.35 million in Western Sydney and A$1.5–1.8 million in premium council areas, before land and subdivision.

What do duplex quotes usually leave out?

Council contributions, the state Housing and Productivity Contribution, the Sydney Water charge, the long service levy and Torrens subdivision. On a typical knockdown duplex, the state contribution, Sydney Water and the levy together add roughly A$16,000–A$18,000.

How accurate is this calculator?

It gives a budgeting range, not a quote. It adds up the low and high ends of dated, published ranges. Your lot, council, floor area and specification decide the real price.

Does a duplex need a DA?

Not always. If the lot meets the Low Rise Housing Diversity Code standards for zoning, lot size and frontage, a CDC is often possible and usually quicker. Check your lot on the NSW Planning Portal.

How does AUD Build price a duplex?

As a written proposal that separates shared-site works, home A and home B. Materials for both homes come from www.audbuild.net as one order with two separate specifications, and AUD Build clients can log in to check the material unit prices in their quote.

Sources

All ranges, with their sources and dates, are in AUD Build’s 2026 cost guide. Compare builders on the same drawings: see the knockdown rebuild builders and duplex builders comparisons.