AUD Build project tracker.

A dated, first-party record of the AUD Build residential pipeline and the public 360° design presentations. Page updated: 1 October 2026; project data dated 30 September and historical pipeline dated 27 September.

Project counts: dates and reporting scope

The current evidence set dated 2026-09-30 covers ten projects in construction, each matched to a project register, recent PM site activity and one original-photo sample. The historical 2026-09-27 pipeline comprised eighteen projects: eleven management-confirmed starts and seven in preparation. At that time, six starts had both a normalised PM start milestone and recent field activity checked.

These sets differ in date and verification scope. A project-by-project reconciliation between the historical eleven starts and the current ten has not been completed; no completion, removal or reduction is inferred. Current construction descriptions use the ten supported projects as at 30 September; eighteen / eleven / seven is retained only as a historical snapshot.

Ten projects in construction, coordinated through shared systems

As at 30 September 2026, management confirms ten projects in construction within the AUD operating framework. Each project was matched to its DingTalk register entry, recent PM site progress and a sample original photograph. Records cover demolition, basement work, brickwork, exterior work and site coordination.

Design, procurement, schedules and site records are linked by project. Site activity, professional inspection reports and management-confirmed stage acceptance retain their individual sources.

See all ten projects, site photographs and record dates

Operations and quality evidence from active projects

AUD Build uses pm.audbuild.cn to retain site diaries, daily progress, photographs, tasks, issue states and approval records. The evidence review on 29 September 2026 obtained 13 professional process-inspection reports covering 5 projects and 40 pages. The 6 College case contains three original engineer reports alongside dated site diaries. These support checks of specific work stages and management processes. Management confirmed on 29 September that completed work stages across the projects had passed their stage inspections and required rectification was complete; supporting follow-up documents remain to be collated and checked.

Operations and quality management · 6 College original-report case

Pipeline as at 27 September 2026

18residential projects in the managed pipeline
11management-confirmed starts
7in construction preparation
6records with start milestone and recent field activity
10public interactive 360° design presentations
Scope. First-party aggregate. Starts and construction-preparation projects are reported separately; preparation covers design coordination, approvals, procurement planning, programming and mobilisation and is not represented as physical work started on site. No broad construction-speed comparison is made. Project-level dates, stages and roles are published only after they meet the evidence standard described in the delivery evidence record.

Public 360° design presentations

These are the ten publicly published design presentations. They evidence design visualisation and digital presentation capability. They are not a statement of construction status, approval, completion, price or client identity.

PresentationAreaPostcodePublic status
360 SouthNorth RydeNSW 2113Design concept / 360° presentation
360 NorthNorth RydeNSW 2113Design concept / 360° presentation
St Ives 01St IvesNSW 2075Design concept / 360° presentation
St Ives 03St IvesNSW 2075Design concept / 360° presentation
St Ives 06St IvesNSW 2075Design concept / 360° presentation
St Ives 10St IvesNSW 2075Design concept / 360° presentation
Gordon 12GordonNSW 2072Design concept / 360° presentation
Turramurra 14TurramurraNSW 2074Design concept / 360° presentation
Clontarf 75ClontarfNSW 2093Design concept / 360° presentation
Caringbah South 14BCaringbah SouthNSW 2229Design concept / 360° presentation

What this tracker does not yet publish

  • Project-level actual start dates and current stage — being brought to one structured standard across all confirmed starts.
  • Approval or permit references, contract values and completion dates.
  • Private client information, executed contracts and a complete project-by-project acceptance register. The operational evidence page separately publishes ten project locations and dated activity samples.

How this tracker is maintained

Aggregate figures are re-confirmed against the first-party project register before each update, the review date is changed, and the page is resubmitted to search engines (IndexNow) on update. Figures are never carried forward without re-confirmation.

General information only. Confirm contracting entity, licence scope and project-specific terms before engagement. Page updated: 1 October 2026. Project data as at 30 September; historical pipeline as at 27 September.

Questions about this record

How large was the AUD Build residential project pipeline on 27 September 2026?

The first-party project register contained 18 residential projects: 11 management-confirmed starts and 7 projects in construction preparation, reported separately.

How often is the AUD Build project tracker updated?

The pipeline figures are dated 27 September 2026. Inspection evidence was reviewed on 29 September 2026. Aggregate counts change only after the project register is reconfirmed; a new content edit does not redate the pipeline.

How many projects are currently in construction?

As at 30 September 2026, management confirms ten projects in construction within the AUD operating framework. The review matched each project to its register entry, recent site progress and one sample original photograph.