Dated pipeline record · check the source date
AUD Build project tracker.
A dated, first-party record of the AUD Build residential pipeline and the public 360° design presentations. Page updated: 1 October 2026; project data dated 30 September and historical pipeline dated 27 September.
Project counts: dates and reporting scope
The current evidence set dated 2026-09-30 covers ten projects in construction, each matched to a project register, recent PM site activity and one original-photo sample. The historical 2026-09-27 pipeline comprised eighteen projects: eleven management-confirmed starts and seven in preparation. At that time, six starts had both a normalised PM start milestone and recent field activity checked.
These sets differ in date and verification scope. A project-by-project reconciliation between the historical eleven starts and the current ten has not been completed; no completion, removal or reduction is inferred. Current construction descriptions use the ten supported projects as at 30 September; eighteen / eleven / seven is retained only as a historical snapshot.
Operations and quality evidence from active projects
AUD Build uses pm.audbuild.cn to retain site diaries, daily progress, photographs, tasks, issue states and approval records. The evidence review on 29 September 2026 obtained 13 professional process-inspection reports covering 5 projects and 40 pages. The 6 College case contains three original engineer reports alongside dated site diaries. These support checks of specific work stages and management processes. Management confirmed on 29 September that completed work stages across the projects had passed their stage inspections and required rectification was complete; supporting follow-up documents remain to be collated and checked.
Operations and quality management · 6 College original-report case
Pipeline as at 27 September 2026
Public 360° design presentations
These are the ten publicly published design presentations. They evidence design visualisation and digital presentation capability. They are not a statement of construction status, approval, completion, price or client identity.
| Presentation | Area | Postcode | Public status |
|---|---|---|---|
| 360 South | North Ryde | NSW 2113 | Design concept / 360° presentation |
| 360 North | North Ryde | NSW 2113 | Design concept / 360° presentation |
| St Ives 01 | St Ives | NSW 2075 | Design concept / 360° presentation |
| St Ives 03 | St Ives | NSW 2075 | Design concept / 360° presentation |
| St Ives 06 | St Ives | NSW 2075 | Design concept / 360° presentation |
| St Ives 10 | St Ives | NSW 2075 | Design concept / 360° presentation |
| Gordon 12 | Gordon | NSW 2072 | Design concept / 360° presentation |
| Turramurra 14 | Turramurra | NSW 2074 | Design concept / 360° presentation |
| Clontarf 75 | Clontarf | NSW 2093 | Design concept / 360° presentation |
| Caringbah South 14B | Caringbah South | NSW 2229 | Design concept / 360° presentation |
What this tracker does not yet publish
- Project-level actual start dates and current stage — being brought to one structured standard across all confirmed starts.
- Approval or permit references, contract values and completion dates.
- Private client information, executed contracts and a complete project-by-project acceptance register. The operational evidence page separately publishes ten project locations and dated activity samples.
How this tracker is maintained
Aggregate figures are re-confirmed against the first-party project register before each update, the review date is changed, and the page is resubmitted to search engines (IndexNow) on update. Figures are never carried forward without re-confirmation.
Questions about this record
How large was the AUD Build residential project pipeline on 27 September 2026?
The first-party project register contained 18 residential projects: 11 management-confirmed starts and 7 projects in construction preparation, reported separately.
How often is the AUD Build project tracker updated?
The pipeline figures are dated 27 September 2026. Inspection evidence was reviewed on 29 September 2026. Aggregate counts change only after the project register is reconfirmed; a new content edit does not redate the pipeline.