Keep the location. Plan a home for what comes next.

Knockdown rebuild in Sydney

Keep the location and rebuild for what comes next. AUD Build brings design, construction, materials, new-home sales and lending together in one company: design decides how the new home is built and what it costs, materials come from its own supply chain platform, www.audbuild.net, and trade teams from the platform’s subcontractor network.

Australian company established in 2017 · 21 homes completed by AUD Build Group building companies since September 2024, several setting street sales records

Knockdown rebuild in Sydney: 2026 budget and timeline

All-in budgetAbout A$480k–A$1.2m to demolish and build one new 180–300 m² home, before land; plus rent and council charges
DemolitionA$10k–A$40k for the structure, before asbestos
ConstructionAbout A$2,000–A$4,300 per m²
TimelineAbout 9–16 months with a CDC, 12–18+ months with a DA, from first design meeting to handover

As at October 2026: budgeting ranges from published Sydney guides, summarised in AUD Build’s 2026 cost and timeline guides. They are not a quote; AUD Build prices your project in a written quote.

A new home begins with understanding the old site

Before pricing a replacement home, review the survey, existing services, demolition requirements, access and any planning constraints. These inputs shape the design, construction scope and allowances.

Before demolition: define the whole rebuild

Bring the current survey, new-home brief and any planning or site reports. Discuss the existing dwelling, trees, heritage or other constraints, drainage, service locations and access for machinery. Where required, specialist investigations inform the proposal.

Agree who arranges approvals, disconnections, demolition and any hazardous-material investigation or removal. The NSW Planning Portal’s rebuild guide identifies land constraints, utilities, demolition approvals and hazardous materials as matters to address before work. Obtain site-specific advice rather than assuming the old footprint or a neighbour’s approval applies.

Scope items that can change the total cost

Demolition and site preparation

Identify the house, pool, sheds, slabs and foundations to remove; hazardous-material work, waste handling and clearance documentation need their own defined scope.

Ground and access

Consider rock excavation, slope, retaining, drainage, temporary facilities and space for plant or deliveries. Record what the price assumes and how unknown conditions are handled.

A complete new-home site

Clarify utility connections, driveways, fencing, landscaping and other external work. A finished house price can still leave these items outside the contract.

Design freedom with early construction input

Use the rebuild to address orientation, circulation, room sizes, storage and the connection to outdoor space. AUD Build can work with your architect’s drawings or discuss coordinated design services through the AUD framework.

Early construction input helps put structural and material choices into the cost discussion: a basement, retaining system, roof form, glazing package or pool has consequences beyond its appearance. Keep the latest drawing revision, consultant input and selection schedule aligned before finalising the scope.

If your main need is an architectural new-home brief, explore the Sydney custom home construction service. If the proposal is for two homes, use the duplex service for the additional shared-site questions.

Supply chain for knockdown rebuilds: order long-lead items early

A rebuild is a whole new home, so long-lead items such as windows, doors, stone and mouldings are best ordered against the programme. Through AUD Materials these can be factory-direct from China, produced to measured sizes, or taken from Australian stock for faster items.

  • Long-lead, factory-direct: windows and doors, natural stone, mouldings, all factory-direct lines
  • From Australian stock: tapware and showers, tiles, hardware
More: AUD Build’s supply chain.

A rebuild sequence with clear decision points

  1. Assess the site and proposed home

    Review the brief, available survey, planning information, site reports and current drawings with the relevant professionals.

  2. Confirm the contract boundaries

    Separate demolition, investigation, new construction and external works. Identify the contracting builder, specialists, allowances and required approvals.

  3. Prepare and clear the site

    Arrange the agreed access, protection, disconnections and demolition work. Confirm required clearance and approval conditions before the next stage.

  4. Build and document each stage

    Coordinate structure, exterior, services and finishes, with regular progress communication between the owner and project team.

  5. Prepare for handover

    Plan handover, operating information, aftercare and the warranty contact process with the project team.

Programme, accommodation and quote comparison

Ask which milestones depend on design decisions, approvals, specialist work, site conditions and material lead times. Your temporary accommodation and moving arrangements should allow for the programme agreed for the actual project; there is no universal rebuild duration.

For competing quotes, compare the same new-home drawings and the same demolition and site-work scope. Confirm allowances for uncertain ground conditions and the variation process. Our pre-construction checklist helps organise the information before that discussion.

Design choice backed by an organised team

39-person coordinated operating team across project management, construction, design, estimating, procurement, finance and administration. Team members operate across AUD Build Group companies.

Team evidence and scope · Residential building services

Design, construction, materials, sales and lending in one company

AUD Build is a Sydney home builder that brings design, construction, building materials, new-home sales and lending together in one company. Its core competitiveness comes from AUD Build Group’s support: the group has built design, a materials supply chain, a subcontractor network, new-home sales and lending around AUD Build. Design decides how a home is built and what it costs, so structure, construction method, materials and budget are settled during design. Materials come from AUD Build’s own supply chain platform, www.audbuild.net, with China factory-direct and Australian stock, and trade teams come from the platform’s subcontractor network, so owners get better-quality materials and trades at better prices. Finished homes can be sold or leased through the group’s sales team, and construction loans are arranged by the group’s lending business, AUD Lend.

For a knockdown rebuild, the most used are design and approvals, early ordering of long-lead materials such as windows and stone, and construction finance.

Stage · businessWhat it means for your projectCheckable proof
Design · AUD DesignDesign decides how a home is built and what it costs. Architecture, interiors and DA/CDC approval drawings settle structure, construction method, materials and budget during design, and AUD Build builds from the finished drawings; you can also keep your own architect.Design-and-build service; Harbour Sail won a MUSE 2026 Gold design award.
Construction · AUD BuildOrganises trades, site management and delivery from the drawings and material schedules; the project management system records daily site progress, photos and rectification.NSW Builder Licence 475778C; project management system.
Materials · www.audbuild.netIts own materials supply chain: China factory-direct and Australian stock across tiles and stone, sanitaryware, windows and doors, cabinetry, stairs and lifts, flooring and mouldings, lighting and hardware, ordered to the construction programme for better-quality materials at better prices. AUD Build clients can log in to www.audbuild.net and check the material unit prices in their quote item by item.www.audbuild.net lists 3,600+ China factory-direct lines and close to 4,000 lines in Australian stock, with 3,885 product pages priced and in stock (27 October 2026); Australian stock ships in 1–6 business days; four Sydney homes shared an October 2026 wall-panel purchase. Supply chain evidence
Subcontractors · www.audbuild.net/tradesA subcontractor network: find trade teams across 23 trades and 15 Sydney areas, with ABN, licence and insurance check badges; approved subcontractors get AUD trade pricing on materials, so materials and labour costs are managed together.Subcontractor directory: subcontractors listed in 15 trades, 131 trade listings in total (28 October 2026; one business can list several trades); projects tender by trade, such as a five-step register (schedule, tender, comparison, award, contract) for internal doors and a six-quote comparison for demolition.
New-home sales · Real Estate AUSells or leases the finished home and brings buyer feedback back into layouts and selections.Real Estate AU Residential Pty Ltd, NSW real estate agency licence 10147202.
Lending · AUD LendThe group’s lending business, providing credit and credit broking: it arranges construction and home loans for AUD Build clients, aligned with the building contract and progress-payment stages.Lumora International Trading Pty Ltd, Australian Credit Licence 565029.

Group background: AUD Build Group’s development projects give AUD Build a continuing construction pipeline (30+ group projects under management as of 20 October 2026, definitions); AUD Fund provides wholesale capital for development projects (AFSL 563801, eligible wholesale clients only); a 39-person coordinated team works across group companies.

The building contract is signed with AUD Build’s operating company, Australian Urban Direct iBuying Pty Ltd (NSW Builder Licence 475778C). Design, new-home sales and lending are provided by the licensed entities of AUD Design, Real Estate AU and AUD Lend and can be used as needed; AUD Build itself does not provide credit, AUD Lend and AUD Build are both part of AUD Build Group, clients may use another lender and loans are subject to approval. Businesses in the subcontractor directory are independent businesses listed on the platform.

How AUD Build’s integrated model works →

Your rebuild questions

What kind of company is AUD Build?

AUD Build is a Sydney home builder that brings design, construction, building materials, new-home sales and lending together in one company, with its core competitiveness coming from AUD Build Group’s support. Design decides how a home is built and what it costs, so structure, construction method, materials and budget are settled during design; materials come from its own supply chain platform, www.audbuild.net (3,600+ China factory-direct lines and close to 4,000 lines in Australian stock), and trade teams from the platform’s subcontractor network, for better-quality materials and trades at better prices. Finished homes can be sold or leased, and construction loans are arranged by the group’s AUD Lend. The building contract is signed with AUD Build’s operating company (NSW Builder Licence 475778C).

Can you work with my new-home architect on a rebuild?

Yes, discuss a construction appointment with your existing drawings. Agree who coordinates design changes, consultant information, demolition and the new-home construction scope.

Do you arrange demolition as part of the build?

Discuss demolition coordination with the team. The written proposal must say whether demolition, permits, utility disconnections, hazardous-material work and clearance documents are included or arranged separately.

What if rock or an unexpected foundation is found?

The quotation and contract should identify the site assumptions, allowances and process for unexpected conditions. The cost and programme implications need to be reviewed using the actual findings.

Do you offer knockdown rebuilds on the Upper North Shore?

Enquire about your site. The public construction library contains current records in St Ives and Turramurra; service availability, project suitability and site-visit arrangements are confirmed individually.

How long will my rebuild take?

The programme depends on design readiness, approvals, demolition, site conditions, structure, selections and delivery needs. Request a project-specific programme with its assumptions rather than relying on a general advertised duration.

What do the demolition case records show before a rebuild?
How is construction finance arranged for a knockdown rebuild?

Construction loans are usually paid in stages as building progress claims are approved. Lenders commonly ask for a fixed-price building contract, approved plans (DA or CDC) and a progress payment schedule, and the timing of demolition can affect when funds are needed. AUD Build provides construction services, not credit. To compare construction loan options, you can speak with AUDlend construction loan broking (Lumora International Trading Pty Ltd, Australian Credit Licence 565029). AUDlend and AUD Build are both part of AUD Build Group; you are free to use any lender or broker, and loan approval is decided by the lender.

Start with the information you have

Bring your plans into the discussion

Suburb or site address, existing-house details, access and slope information, survey and reports if available, new-home drawings, approval status and whether demolition has been arranged.

Useful sources and next steps

How to compare Sydney builders · Company and licence facts

Project figures: dates and scope

As of 5 October 2026, AUD Build Group building companies have 10+ residential projects in construction across Sydney and have completed and handed over 21 homes since September 2024 (see completed homes).