Keep the location. Plan a home for what comes next.

Knockdown rebuild in Sydney

From the existing house to a new custom home, AUD Build helps coordinate the design, demolition scope, site preparation and construction decisions that make a rebuild a single, manageable project.

Excavator and cleared demolition area at 3 Amesbury Avenue · 2026-09-30
3 Amesbury Avenue · 2026-09-30 · construction-stage photograph. View role and stage records.

A new home begins with understanding the old site

A knockdown rebuild lets you reconsider the home while staying in a familiar neighbourhood. It also brings decisions that a clear-site building quote may not address: demolition, utility disconnection, remaining foundations, access, neighbours and the cost of site preparation. AUD Build can discuss these items alongside your new-home design, so the construction scope starts with the actual block. Current public project records include St Ives, Gordon, Turramurra and other Sydney locations; availability for your site is confirmed with the team.

Before demolition: define the whole rebuild

Bring the current survey, new-home brief and any planning or site reports. Discuss the existing dwelling, trees, heritage or other constraints, drainage, service locations and access for machinery. Where required, specialist investigations inform the proposal.

Agree who arranges approvals, disconnections, demolition and any hazardous-material investigation or removal. The NSW Planning Portal’s rebuild guide identifies land constraints, utilities, demolition approvals and hazardous materials as matters to address before work. Obtain site-specific advice rather than assuming the old footprint or a neighbour’s approval applies.

Scope items that can change the total cost

Demolition and clearance

Identify the house, pool, sheds, slabs and foundations to remove; hazardous-material work, waste handling and clearance documentation need their own defined scope.

Ground and access

Consider rock excavation, slope, retaining, drainage, temporary facilities and space for plant or deliveries. Record what the price assumes and how unknown conditions are handled.

A complete new-home site

Clarify utility connections, driveways, fencing, landscaping and other external work. A finished house price can still leave these items outside the contract.

Design freedom with early construction input

Use the rebuild to address orientation, circulation, room sizes, storage and the connection to outdoor space. AUD Build can work with your architect’s drawings or discuss coordinated design services through the AUD framework.

Early construction input helps put structural and material choices into the cost discussion: a basement, retaining system, roof form, glazing package or pool has consequences beyond its appearance. Keep the latest drawing revision, consultant input and selection schedule aligned before finalising the scope.

If your main need is an architectural new-home brief, explore the Sydney custom home construction service. If the proposal is for two homes, use the duplex service for the additional shared-site questions.

A rebuild sequence with clear decision points

  1. Assess the site and proposed home

    Review the brief, available survey, planning information, site reports and current drawings with the relevant professionals.

  2. Confirm the contract boundaries

    Separate demolition, investigation, new construction and external works. Identify the contracting builder, specialists, allowances and required approvals.

  3. Prepare and clear the site

    Arrange the agreed access, protection, disconnections and demolition work. Confirm required clearance and approval conditions before the next stage.

  4. Build and document each stage

    Coordinate structure, envelope, services and finishes. Record progress and inspection requirements, with rectification and reinspection evidence matched to the relevant item.

  5. Prepare for handover

    Confirm required completion documents, remaining work, access and the defects-reporting process. A completed demolition or passed stage inspection is not whole-home completion.

Programme, accommodation and quote comparison

Ask which milestones depend on design decisions, approvals, specialist work, site conditions and material lead times. Your temporary accommodation and moving arrangements should allow for the programme agreed for the actual project; there is no universal rebuild duration.

For competing quotes, compare the same new-home drawings and the same demolition and site-work scope. Confirm allowances for uncertain ground conditions and the variation process. Our pre-construction checklist helps organise the information before that discussion.

Follow real demolition and site-preparation records

These dated dossiers make the work sequence visible. Each identifies the recorded construction role, current stage and evidence gaps, so site preparation is not confused with a completed new house.

Excavator and cleared demolition area at 3 Amesbury Avenue · 2026-09-30

3 Amesbury Avenue · 2026-09-30

Demolition and remaining work

St Ives records describe demolition progressing, with pool and foundation work still identified in the dated record.

Read the project dossier →Builder as recorded: Opera Ridge Projects pty ltd. See the dossier for role and inspection limits.
Excavator and partially demolished building at 9 Barons Crescent · 2026-10-01

9 Barons Crescent · 2026-10-01

Access and demolition coordination

Hunters Hill records distinguish the access issue recorded on 30 September from demolition activity recorded on 1 October.

Read the project dossier →Builder as recorded: Contractual builder not established in the public dossier. See the dossier for role and inspection limits.
Site entrance and AUD construction fencing at 20 Albert Street · 2026-09-28

20 Albert Street · 2026-09-28

Site establishment after clearance

Gladesville photographs and records show the cleared site, fencing, temporary facilities and monitoring arrangements.

Read the project dossier →Builder as recorded: Opera Ridge Projects pty ltd. See the dossier for role and inspection limits.

Explore all 11 construction dossiers

Design choice backed by an organised team

The AUD Build operating team comprises 39 people across seven functions, confirmed by management and the connected directory on 30 September 2026. Team members are employed across different AUD-framework companies and coordinate design, costing, suppliers and site work. This is a coordinated team count, not a claim that all 39 are employed by the Australian licensed builder.

Team evidence and scope · Operations and quality-management evidence

Your rebuild questions

Can you work with my new-home architect on a rebuild?

Yes, discuss a construction appointment with your existing drawings. Agree who coordinates design changes, consultant information, demolition and the new-home construction scope.

Do you arrange demolition as part of the build?

Discuss demolition coordination with the team. The written proposal must say whether demolition, permits, utility disconnections, hazardous-material work and clearance documents are included or arranged separately.

What if rock or an unexpected foundation is found?

The quotation and contract should identify the site assumptions, allowances and process for unexpected conditions. The cost and programme implications need to be reviewed using the actual findings.

Do you offer knockdown rebuilds on the Upper North Shore?

Enquire about your site. The public construction library contains current records in St Ives, Gordon and Turramurra; service availability, project suitability and site-visit arrangements are confirmed individually.

How long will my rebuild take?

The programme depends on design readiness, approvals, demolition, site conditions, structure, selections and delivery needs. Request a project-specific programme with its assumptions rather than relying on a general advertised duration.

Start with the information you have

Bring your plans into the discussion

Suburb or site address, existing-house details, access and slope information, survey and reports if available, new-home drawings, approval status and whether demolition has been arranged.

The enquiry form accepts an optional PDF and provides a receipt for a saved submission. Quotations and visits are confirmed separately; a submission is not a booking.

Useful sources and next steps

NSW Planning Portal: knockdown and rebuild considerations · How to compare Sydney builders · Company and licence facts

Service information reviewed 1 October 2026. Project evidence retains its own date, contracting role and inspection scope. Confirm your project’s builder, consultant appointments, inclusions and approvals in writing.

Project figures: dates and scope

Historical snapshot (27 September 2026): 18 residential projects in the pipeline = 11 management-confirmed started projects + 7 in construction preparation. The construction evidence reviewed on 30 September covers 10 projects; the public library reviewed on 1 October contains 11 named project dossiers. These figures describe the historical pipeline, evidence coverage and dossier count respectively.

18/11/7 is not a newly counted current total. The historical 11 starts and the later 10 evidence-covered projects have not been reconciled project by project; the difference does not establish completions or withdrawals. Read the counting method and sources